Page 21 of 94 FirstFirst ... 11 18 19 20 21 22 23 24 31 ... LastLast
Results 201 to 210 of 934

Thread: Campus Construction

  1. #201

    Default Re: Campus Construction

    Demolition of Huger, Baker, Bonin and Evageline should start soon.

    Huger-baker-bonin

    The stump to the right was an Oak tree that was over 50 years old. Funny how they take these trees down when school is out. This is one they said they were going to move.

    baker-bonin-evangeline

    Oak tree removed from behind Bonin Hall
    bonin-tree

    Plaque at entrance to old Huger hall (I hope nobody steals it)

    huger-plaque

    Plaque at entrance to old Baker hall (I hope nobody steals this one too)baker-plaque


  2. #202

    Default Re: Campus Construction

    New Baker hall as of 5-21-11 Brick work up to the third floor level at this side of the building

    new-baker-4-21

    New Baker as seen from Taft Street

    new-baker-1

    Brick layer foreman to the left. they were setting precast concrete sections on the wall. Note the two story poles attached by "C" clamps on the walls. Story poles are used to make sure you end where you started.

    brick-foreman


  3. #203

    Default Re: Campus Construction

    Parking Garage as of 5-21-11

    parking-garage-5-21

    One of the Mc Kinley street entrances. I was hoping they would have an arch somewhere on this building as there is an arch on almost all of the buildings on campus.

    parking-garage-mc-kinley

    Parking garage as seen from the front of Hamilton Hall

    parking-garage-hamilton


  4. #204

    Default Re: Campus Construction

    Facilities will be much better, but wish we had much more land for the more landscaping.

    I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.

    The campus was more beautiful then, but it got pretty hot in those old buildings.


  5. Default Re: Campus Construction

    Quote Originally Posted by USL1970 View Post
    _ Facilities will be much better, but wish we had much more land for the more landscaping.

    I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.

    The campus was more beautiful then, but it got pretty hot in those old buildings. _
    Just wait---T-Joe's landscaping is on the way!!!!! I wish we had the fore and after of the entire campus since he came!!!!!

  6. #206

    Default Re: Campus Construction

    I do know that the Campus is much cleaner now. they have had prison labor on campus on Saturdays to help with the clean up. Not long after Dr. Savoie became president they did a general clean up of the buildings on campus. That was about the same time they cleaned Cajun Field. It looks much better now.

    I would like to see what the landscaping will look like around the parking garage and New Baker and the Tulane Ave dorm (probably new Huger).


  7. Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ I do know that the Campus is much cleaner now. they have had prison labor on campus on Saturdays to help with the clean up. Not long after Dr. Savoie became president they did a general clean up of the buildings on campus. That was about the same time they cleaned Cajun Field. It looks much better now.

    I would like to see what the landscaping will look like around the parking garage and New Baker and the Tulane Ave dorm (probably new Huger). _
    I think--again---- I think that in the visual that the university released--it showed some really nice seating areas with the trees and just nicely done L-scaping---With all this done so well --just know that the rest will be very much in line with the total construction package!!!!

  8. #208

    Default Re: Campus Construction

    Baker Hall Saturday May 28, 2011. the dark colored brick on the left has been cleaned the rest has not.

    baker1

    View of Baker Hall from Taft Street

    baker2

    The building is basically out of the weather. Still plenty of brick work to do on the back side of the building


  9. Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Baker Hall Saturday May 28, 2011. the dark colored brick on the left has been cleaned the rest has not.

    baker1

    View of Baker Hall from Taft Street

    baker2

    The building is basically out of the weather. Still plenty of brick work to do on the back side of the building _
    Get these guys to do Moore Field!!!!

  10. #210

    Default Re: Campus Construction

    Parking Garage as of May 28, 2011.

    garage1

    Two entrances on McKinley street

    this one near Angelle Hall

    garage2

    this one near Hamilton Hall

    garage3

    they should be pretty close to being through with the McKinley side of the garage by the end of next week. If that happens, they will be about 50% finished with the erection of the building.

    This is a view from the front yard of Hamilton Hall

    garage4

    They have placed temprary fencing around old Baker and Huger along with Bonin, Evangeline and Buchanan Halls. Looks like demolition should start pretty soon on Bonin, old Baker and Huger and Evageline. (Maybe next week)


Page 21 of 94 FirstFirst ... 11 18 19 20 21 22 23 24 31 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA (Academics)
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum ViewMy Recipe
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •