    Quote Originally Posted by HelmutVII View Post
    Busting rebar and setting forms today. Should be placing concrete for foundation very soon.
    Precast concrete walls are going up at Southside High. Most of the Lemoine subs should be heading to the Tigue.

  2. #192

    Default Re: Construction Cam is Up!!!!!!!!

    Someone moved the Construction Cam. Much better view now


  3. UL Baseball Re: Construction Cam is Up!!!!!!!!

    Yes, more symmetrical, I noticed that this morning when I checked things out.


  4. #194

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by BeauCajun View Post
    Precast concrete walls are going up at Southside High. Most of the Lemoine subs should be heading to the Tigue.
    Could be differnt subs. Are doing precast panels or tilt up at the school?

  5. #195

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Could be differnt subs. Are doing precast panels or tilt up at the school?
    Looking at the forms they are placing it seems to encompass a large area with plumbing/electrical risers but seems to have a large amounts of loose dirt. Is this going to be covered over or is there additional work needed before the pour can happen? Or is the loose dirt in the view not in the area of the pour?

  6. #196

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Looking at the forms they are placing it seems to encompass a large area with plumbing/electrical risers but seems to have a large amounts of loose dirt. Is this going to be covered over or is there additional work needed before the pour can happen? Or is the loose dirt in the view not in the area of the pour?
    They are forming up and placing rebar for footings. Once the concrete for the footings is placed then I suspect they will come back and place a slab over the areas between the footings. The footing is what the building is place upon while the slab is basically a floor. This is very common construction technique in commercial construction.

    I would hope that they would move the camera a little further away because, once they start erection the structure the only thing we will see is the wall that is going to be atop the footing immediately in front of the camera.

  7. #197

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    They are forming up and placing rebar for footings. Once the concrete for the footings is placed then I suspect they will come back and place a slab over the areas between the footings. The footing is what the building is place upon while the slab is basically a floor. This is very common construction technique in commercial construction.

    I would hope that they would move the camera a little further away because, once they start erection the structure the only thing we will see is the wall that is going to be atop the footing immediately in front of the camera.
    So all the current forming is for footings? I just thought all the non-packed dirt looked odd in between all the areas awaiting a concrete pour. I'm also curious about how deep the footings might be for a structure of this size. From the view it looks like about 3'.

  8. #198

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    So all the current forming is for footings? I just thought all the non-packed dirt looked odd in between all the areas awaiting a concrete pour. I'm also curious about how deep the footings might be for a structure of this size. From the view it looks like about 3'.
    The footings connect pile caps and are used to transfer loads to the deep foundation. I THINK they placed auger cast piles that were about 40 or 50 feet deep.

  9. Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    The footings connect pile caps and are used to transfer loads to the deep foundation. I THINK they placed auger cast piles that were about 40 or 50 feet deep.
    ---Helmut---probably the guy with the least knowledge of this asks---Does the mid stadium seem smaller than thought to be at this time???

  10. #200

    Default

    I have actually been impressed with the amount of workers lately and how much progress theyve made the past two weeks.


Page 20 of 266 FirstFirst ... 10 17 18 19 20 21 22 23 30 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 02:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 06:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 08:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 01:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •