If we are not putting an upper deck then the picture with the overhang and canopy is the way to go. Do what Houston Cajun talked about and bowl it in.
Interesting comment about some of the structure being prefabricated. Definitely possible.
For anyone who’s visited the San Antonio Riverwalk —- the Hilton Palacio del Rio hotel was constructed for the 1968 World’s Fair utilizing modular construction techniques. 500 rooms and 21 stories! Might be a good way to tackle the press box/suite structure, and likely save a bunch of construction funding. 🧐
Will we still be able to redo the west side lower bowl at a later date? It really needs a remodel too. The rows are so close together and hard to move around in. Or would the lower west side have to be done at the same time, making the project cost skyrocket? If it can be split up then i’m fine with it. If not, then tear the whole thing down and redo it.
There are currently 1 users browsing this thread. (0 members and 1 guests)