Page 99 of 266 FirstFirst ... 89 96 97 98 99 100 101 102 109 ... LastLast
Results 981 to 990 of 2656

Thread: The Building of Russo Park at Louisiana

  1. #981

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    Not sure I follow but the DensGlass should be applied to the metal studs all the way around the backside. This is where your moisture/vapor barrier is located and that needs to be a seamless unbroken system. The cinder blocks are for the interior structure (bathroom). There will be an air gap between the cinder blocks and the DensGlass. Brick/Stucco will be applied off the DensGlass.
    This section here. May be an optical illusion. Maybe they still need to install the studs outside.
    Attached Images Attached Images

  2. #982

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by wcd35 View Post
    This section here. May be an optical illusion. Maybe they still need to install the studs outside.
    That is a concrete block wall.

  3. #983

    Default Re: Construction Cam is Up!!!!!!!!

    NM


  4. #984

    Default Re: Construction Cam is Up!!!!!!!!

    Rode by at lunch the precast decks for the grandstand area are on site in the parking lot. I didn't see them last week.


  5. #985

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by wcd35 View Post
    This section here. May be an optical illusion. Maybe they still need to install the studs outside.
    Difficult to say from this angle but I'm guessing it has remained open at this stage for additional work such as plumbing or electrical.

  6. #986

    Default Re: Construction Cam is Up!!!!!!!!

    Working this evening on the roof.


  7. #987

    Default Re: Construction Cam is Up!!!!!!!!

    It looks like they are putting on roof panels. They may be doing this at night because there is not enough room for all the trades to work at the same time.


  8. #988

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    It looks like they are putting on roof panels. They may be doing this at night because there is not enough room for all the trades to work at the same time.
    Think you are right. They are still working early this a.m. and it appears there are indeed roof panels in place. Another week and they could be out of the weather for the most part.

  9. #989

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    Think you are right. They are still working early this a.m. and it appears there are indeed roof panels in place. Another week and they could be out of the weather for the most part.
    Might take longer than a week. We should be able to tell for sure today if roof panels are on. We won't be able to see sunlight in the fourth level.

  10. #990

    Default Re: Construction Cam is Up!!!!!!!!

    Now they're putting the weather sealant directly on the cement blocks in that area. Was just wondering what that area is going to be and why it's different than the rest of the structure. Is the elevator going to be near there? I know they were putting one elevator and leaving an area for a 2nd in the future as well.


Page 99 of 266 FirstFirst ... 89 96 97 98 99 100 101 102 109 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 02:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 06:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 08:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 01:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •