Page 43 of 78 FirstFirst ... 33 40 41 42 43 44 45 46 53 ... LastLast
Results 505 to 516 of 934

Thread: Campus Construction

  1. #505

    Default Re: responses very

    Quote Originally Posted by Avocarto View Post
    I'm new here , nice thread!
    Welcome! Please visit often.

  2. #506

    Default Re: responses very

    Oops, then I apologize. Welcome aboard!


  3. #507

    Default Re: responses very

    No photos this week. Plenty of work being done but most of it is inside. Exterior views didn't change much this week.


  4. #508
    Zeebart21's Avatar Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever

    Default Re: responses very

    Quote Originally Posted by ULvictory View Post
    Hey guys! Mr Avocarto is an LSU graduate and has been introduced to U L via my friendship! He is a Chevron executive and a good man! Just another example of other higher ed entities embracing true accomplishments within our Louisiana borders! Go Cajuns!
    Mr Avocarto, welcome aboard sir! A bit of advice...please dont let too many people know you are an aquaintence of UL Victory!!



    Z

  5. #509

    Default Re: responses very

    Starting with Buchanan Hall this time. They have started to do Asbestos abatement. Additional work being done in the new Rose Garden area too.

    buchanan-1

    Buchanan Hall from the rear of Gullory Hall. Windows are all covered up. Blowers creating negative air pressure in the building.

    buchanan-2

    Looking through Randolph Hall to the Arcade leading to the Vermilion Office.

    randolph-2

    Randolph Hall getting a handicapped ramp.

    randolph-1

    Cleaning up the parking lot behind Guillory Hall. Getting ready to move out to make room for transforming Guillory Hall to food service during Student Union Renovation.

    rose-1

    Gutter Downspouts waiting to be installed on Building 1.

    rose-2

    Exterior finish work on building 1. Not much left on the outside of this building. The gutter installer has showed up. Usually the last thing they do on the exterior.

    building1-1

    Alley facade of building 1. Columns still to do.

    building1-2


    Looking in the window you can see a ceiling fan installed and working in building 1. They started leaving the interior lights on all night in building 1. I guess the night shift uses them.

    building1-3

    American flag on the fence. Been there since day one of construction in the Rose Garden. I was hoping it would survive.

    building1-4


    University Ave facade of building 2. Bricks cleaned and waterproofing has started.

    building2-3

    Rear of Building 2. The new courtyard between it and Harris Hall. Harris Hall is to the left.

    building2-2

    Another view of the rear of building 2 from Boucher Drive. Harris Hall is to the right. I used to take photos from the fire escape but it was too close to the wall of the new building.

    building2-1

    Alley way facade of building 2

    building2-4


  6. #510

    Default Re: responses very

    Some different views this week.

    This is the rear of building number 1 as seen from the rear of Randolph Hall. This will be the new Rose Garden.

    building1-1

    Building Number 1 as seen from the side of McLauren Gym

    building1-3

    Alley Facade of Building 1, the exterior is just about finished. They are pushing to complete the same facade of building 2 so they can finish up between the buildings

    building1-4

    The University Ave entrance to Building 1. They are getting ready to place the concrete walk. I'm thinking an awning similar to the awnings they took off of old Baker and Huger would look really good here. I don't think they would make it out of copper though.

    building1-5

    Alley facade of building 2. They have really made good progress and this facade it has almost caught up to building 1.

    building2-1

    Building 1 (foreground) and 2 (background) as seen from one of the drives to the parking lot behind Guillory Hall.

    building1-2

    Still doing asbestos abatement on Buchanan Hall

    buchanan1-1

    The new rear entrance to Randolph Hall. Looking towards University Ave.

    Randolph1-1


    Harris Hall gets new windows as seen from the front of Mc Lauren Gym.

    harris-1

    Some old ceiling fans in the second floor "Piano Room" in Harris Hall. One of the fans was on and it caught my eye through the open front door.

    harris1-2


  7. #511

    Default Re: responses very

    Getting harder to take photos each week as they are getting close to the end of exterior work.

    Forming up for new sidewalk between Randolph (to the right) and Building 1 (to the left) Buchanan in the background.

    rose-1

    University ave. facade with new sidewalks and AC unit pads.

    rose-2

    Building 1 as seen from the parking lot behind Guillory Hall (next to the old Saucier clinic.

    rose-3

    Cleaning up the alley between building 1 and building 2. Sidewalks and lighting coming next.

    rose-5

    Cleaned and yet to be cleaned brick on the Boucher street facade of building 2 as seen from the side of McLauren gym

    rose-4


  8. Default Re: Campus Construction

    From the clean bricks shot I will take a guess and say Building 1 as seen from the parking lot behind Guillory Hall has clean bricks.


  9. #513

    Default Re: Campus Construction

    Yes building 1 has been cleaned for some time now. The exterior of building 1 is just about finished except for the columns at the main entrance and maybe some clean up and caulking here and there. Once they started with sidewalk construction you can figure that the outside work is pretty much completed because they won't use any more manlifts where they have sidewalks.


  10. #514

    Default Re: Campus Construction

    They moved out the job shack late last week so that means it's the beginning of the end. With the job shack gone the University Ave facade of building 1 can be better seen.

    building1-1

    New rose garden area taking shape.

    new-rose-garden

    Building 1 and 2 as seen from the parking lot behind Guillory Hall.

    building1-2

    Building 1 alley facade as seen from Student Union service drive.

    building1-4

    Building 1 alley facade as seen from University Ave.

    building1-3

    Building 2 alley facade as seen from University Ave.

    building2-2

    Building 2 alley facade as seen from the Student Union service drive.

    building2-3


    Waterproofing Building 2 alley facade. Workers have different ways to beat the sun.

    building2-1


  11. #515

    Default Re: Campus Construction

    After looking at the photo's for the last several months I think they can say, "this is the University of Louisiana"......It has been 54 years for me now. Big change I must say.....


  12. #516

    Default Re: Campus Construction

    There are one or two buildings accross the swamp from the student union facing the Blvd. I don't remember the name of the building(s), but they are total eyesores. I don't think the buildings are being used for anything, at least they shouldn't be. I hope they are being torn down to make a clear view of the swamp and renovated student union. Just a simple removal would help beautify the campus. Can you please confirm the status of them?


Page 43 of 78 FirstFirst ... 33 40 41 42 43 44 45 46 53 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Acadiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •