    Quote Originally Posted by HelmutVII View Post
    Eight months to complete a new Dorm and in their spare time they built a 1000 car parking garage, demoed two 7 story dorms and started building another dorm. Not too shabby.
    UNBELIEVABLE!

  2. #292

    Default Re: Campus Construction

    As usual, a great update! Thanks.


  3. #293

    Default Re: Campus Construction

    If only the softball renovation could have gone this fast


  4. #294

    Default Re: Campus Construction

    Quote Originally Posted by Cajun_Jim View Post
    If only the softball renovation could have gone this fast
    Are they finished yet?

  5. #295

    Default Re: Campus Construction

    Looks like asbestos removal is continuing on Bonin Hall as they still have some areas under positive air pressure.

    This is a view of the finished Baker Hall. This is the last photo I will take from this viewpoint.

    baker-finis

    View of the North facade of New Baker Hall with New Huger to the rear of the photo. Parking garage is behind me.

    new-baker-huger-1

    View of New Huger from the side of New Baker. The guys on the roof are placing roof shingles on this part of new Huger.

    new-huger-1

    Rear of New Huger Hall. New Baker is to the right.

    new-huger-2

    Rear entrance area of New Huger Hall.

    new-huger-3

    Rear entrance area of New Baker Hall. (the same place on New Huger as shown on photo above)

    new-baker-1

    Parking garage as seen from the north side of New Baker hall. Hamilton Hall is to the right.

    garage-from-baker

    Parking garage as seen from band practice field. They are painting the bare concrete. The brick on the garage appears to be a brick product not stained concrete. I cant tell if it's a full brick or an applique. They did do a very good job of application though. The painters are caulking the joints and cleaning the brick as they go.

    garage-paint

    McKinley street facade of Parking garage. They were supposed to open for parking on Thursday but they did not make it. It does not appear to be that big of a problem now but I would suspect that it will be a problem pretty soon.

    garage-mckinley

    Hamilton Hall, (my old elementary school) as seen from the walkway between the parking garage and New Baker Hall.

    hamilton-hall


  6. Default Re: Campus Construction

    The parking garage has a very clean look to it.

    Can you tell if the inset bricks in the side walk will be a new campus theme, or some kind of visual spin off from the Walk of Honor?


    Geaux Cajuns

  7. #297

    UL Softball Re: Campus Construction

    Every time I log on here, I look forward to seeing the pictures of the campus construction. Thank you so much for posting them. They are impressive! I am so proud of how our campus looks or rather, will look. Please continue to post your pictures.


  8. #298

    Default Re: Campus Construction

    Quote Originally Posted by Turbine View Post
    The parking garage has a very clean look to it.

    Can you tell if the inset bricks in the side walk will be a new campus theme, or some kind of visual spin off from the Walk of Honor?
    Don't know about the bricks in the sidewalk except that the side walk that was there before was a concrete that was stamped and stained to look like brick. Anyhow, the new sidewalk looks nice, although I'm wondering if it will be slippery when the sidewalk gets cruddy. There won't be much sun on it between Hamilton and the garage or between Angelle and the garage so it could get mold and mildew on it.

  9. #299

    Default Re: Campus Construction

    Quote Originally Posted by LuLu View Post
    Every time I log on here, I look forward to seeing the pictures of the campus construction. Thank you so much for posting them. They are impressive! I am so proud of how our campus looks or rather, will look. Please continue to post your pictures.
    There is still plenty of work to be done on campus to take photos of. I just won't be taking many photos of New Baker Hall because it's finished.

  10. #300

    Default Re: Campus Construction

    Since Baker Hall is finished this will be the final before and after of Baker Hall.

    January 2, 2011

    demo-1

    August 13, 2011, Finis.

    baker-finis

    The only thing they have left to do is to install lights along the sidewalk along the front and side of the building.


Page 30 of 94 FirstFirst ... 20 27 28 29 30 31 32 33 40 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA (Academics)
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum ViewMy Recipe
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •