Page 25 of 78 FirstFirst ... 15 22 23 24 25 26 27 28 35 ... LastLast
Results 289 to 300 of 934

Thread: Campus Construction

  1. #289

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    This is what I understand happened with Fletcher Hall. .
    Yep, that's pretty much what I was told as well.

    I've heard that the administration has fixing Fletcher on their priority list but it'll be a few years while they try to get the funding. Getting the money is harder with academic buildings because they don't have the public/private option like with the new dorms or student fee revenue like what's helping fund the Student Union project.

  2. #290

    Default Re: Campus Construction

    The asbestos removal is completed on the Rose Garden Dorms. Waiting on clearance on Monday to proceed with demolition on Wednesday. Found much more asbestos then originally anticipated resulting in longer time and more money. Two feet of contaminated soil had to be removed from under Old Baker, Old Huger and Bonin. It should not take too long to demolish the buildings. Debris removal will be the limiting factor.

    Football players and soccer players moved into new Baker on August 3. Only a few minor things left to do on New Baker. Parking garage is set to be used for parking on August 11. Credit Union will be ready in late September. New Huger is on schedule to be finished before Thanksgiving.

    New Baker August 7, 2011 with sod rolls waiting to be installed on Band field

    baker-8-6

    Ground level view of sod installation with New Baker in the background. The photo shows the turtleback on the field. There should be no water standing on the field. The grass is a drought tolerant hybrid Bermuda that is resistant to herbicides. Supposedly very easy to maintain.

    baker-ground-level

    Sod rolls waiting to be laid out. A bobcat skid steer loader picks up the roll and lays the entire roll down in less then a minute.

    grass-rolls

    New Huger hall as seen from the corner of Tulane and Taft.

    Huger-tulane

    New sidewalk between Parking Garage and Angelle Hall.

    garage-angelle


    New sidewalk between Parking garage on right and Hamilton Hall on left. The garage is about as wide as it could be with very little room between Hamilton and Angelle. The garage is not sprinkled and lets hope a car does not catch fire in the garage.

    garage-hamilton

    I will wait to do the monthly comparison next week because both the parking garage and New Baker will be occupied by then. Eight months to complete a new Dorm and in their spare time they built a 1000 car parking garage, demoed two 7 story dorms and started building another dorm. Not too shabby.


  3. #291

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    Eight months to complete a new Dorm and in their spare time they built a 1000 car parking garage, demoed two 7 story dorms and started building another dorm. Not too shabby.
    UNBELIEVABLE!

  4. #292

    Default Re: Campus Construction

    As usual, a great update! Thanks.


  5. #293

    Default Re: Campus Construction

    If only the softball renovation could have gone this fast


  6. #294

    Default Re: Campus Construction

    Quote Originally Posted by Cajun_Jim View Post
    If only the softball renovation could have gone this fast
    Are they finished yet?

  7. #295

    Default Re: Campus Construction

    Looks like asbestos removal is continuing on Bonin Hall as they still have some areas under positive air pressure.

    This is a view of the finished Baker Hall. This is the last photo I will take from this viewpoint.

    baker-finis

    View of the North facade of New Baker Hall with New Huger to the rear of the photo. Parking garage is behind me.

    new-baker-huger-1

    View of New Huger from the side of New Baker. The guys on the roof are placing roof shingles on this part of new Huger.

    new-huger-1

    Rear of New Huger Hall. New Baker is to the right.

    new-huger-2

    Rear entrance area of New Huger Hall.

    new-huger-3

    Rear entrance area of New Baker Hall. (the same place on New Huger as shown on photo above)

    new-baker-1

    Parking garage as seen from the north side of New Baker hall. Hamilton Hall is to the right.

    garage-from-baker

    Parking garage as seen from band practice field. They are painting the bare concrete. The brick on the garage appears to be a brick product not stained concrete. I cant tell if it's a full brick or an applique. They did do a very good job of application though. The painters are caulking the joints and cleaning the brick as they go.

    garage-paint

    McKinley street facade of Parking garage. They were supposed to open for parking on Thursday but they did not make it. It does not appear to be that big of a problem now but I would suspect that it will be a problem pretty soon.

    garage-mckinley

    Hamilton Hall, (my old elementary school) as seen from the walkway between the parking garage and New Baker Hall.

    hamilton-hall


  8. Default Re: Campus Construction

    The parking garage has a very clean look to it.

    Can you tell if the inset bricks in the side walk will be a new campus theme, or some kind of visual spin off from the Walk of Honor?


  9. #297

    UL Softball Re: Campus Construction

    Every time I log on here, I look forward to seeing the pictures of the campus construction. Thank you so much for posting them. They are impressive! I am so proud of how our campus looks or rather, will look. Please continue to post your pictures.


  10. #298

    Default Re: Campus Construction

    Quote Originally Posted by Turbine View Post
    The parking garage has a very clean look to it.

    Can you tell if the inset bricks in the side walk will be a new campus theme, or some kind of visual spin off from the Walk of Honor?
    Don't know about the bricks in the sidewalk except that the side walk that was there before was a concrete that was stamped and stained to look like brick. Anyhow, the new sidewalk looks nice, although I'm wondering if it will be slippery when the sidewalk gets cruddy. There won't be much sun on it between Hamilton and the garage or between Angelle and the garage so it could get mold and mildew on it.

  11. #299

    Default Re: Campus Construction

    Quote Originally Posted by LuLu View Post
    Every time I log on here, I look forward to seeing the pictures of the campus construction. Thank you so much for posting them. They are impressive! I am so proud of how our campus looks or rather, will look. Please continue to post your pictures.
    There is still plenty of work to be done on campus to take photos of. I just won't be taking many photos of New Baker Hall because it's finished.

  12. #300

    Default Re: Campus Construction

    Since Baker Hall is finished this will be the final before and after of Baker Hall.

    January 2, 2011

    demo-1

    August 13, 2011, Finis.

    baker-finis

    The only thing they have left to do is to install lights along the sidewalk along the front and side of the building.


Page 25 of 78 FirstFirst ... 15 22 23 24 25 26 27 28 35 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 5 users browsing this thread. (0 members and 5 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Acadiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •