  1. #253

    Default Re: Campus Construction

    Health Services and other services that are in Guilllory and Corona to move will move to OK Allen once it's renovated. Renovation of OK allen was funded by Student Union funds. OK Allen was in pretty good shape considering it was almost 100 years old. It had started as and "L" shaped building had an addition to make it a "T" shaped building then two more additions to the rear (to the quad). There was some rot found on the roof and all of the roof trim had to be removed due to rot. It still had the Kitchen area in tact but no equipment.

    I would suspect that things would get going after OK Allen is renovated. There is an energy efficiency project going on now that is upgrading the cooling tower and chilled water loop that is supplied by the existing Student Union cooling tower and mechanical system. I would guess that is in anticipation of the renovation but I'm not 100% sure of that. I am not involved in the Student Union Renovation project (other than OK Allen) so I don't know particulars.


  2. #254

    Default Re: Campus Construction

    VII sure did some legwork on this project.


  3. #255

    Ragin' Cajuns Re: Campus Construction

    Is the area for the band to practice any smaller than prior to the new construction? If so, will the area be large enough for the band to actually practice formations at its current size and/or at 300+ strong?


  4. #256

    Default Re: Campus Construction

    Quote Originally Posted by ULEverywhere View Post


    So instead they will focus on starting remolding the inside of the union.

    Normally I'm not a stickler for spelling but this is hilarious. "Remolding". I'm sure the Union has plenty of mold already. But, I'm sure they could always stand to remove it all and apply a fresh coat of mold.

  5. Default Re: Campus Construction

    Quote Originally Posted by Kal View Post
    _ Normally I'm not a stickler for spelling but this is hilarious. "Remolding". I'm sure the Union has plenty of mold already. But, I'm sure they could always stand to remove it all and apply a fresh coat of mold. _
    Lol well deserved, they can recycle the mold from the older dorms. Maybe Stokes?

  6. #258

    Default Re: Campus Construction

    Quote Originally Posted by DaddyCajun View Post
    _ Is the area for the band to practice any smaller than prior to the new construction? If so, will the area be large enough for the band to actually practice formations at its current size and/or at 300+ strong? _
    It's about the same size (20 to 20). It should be fine.

  7. #259

    Default Re: Campus Construction

    Still removing asbestos from old dorms along University Ave. They have returned to Evangeline Hall for more asbestos removal. Looks like they must have found some more. The crawl space under Bonin Hall is sealed off. That must be a hell of a job removing asbestos under that building.

    New Huger from Tulane Ave.

    huger-tulane

    New Huger on left, new Baker to the rear, New Parking Garage far rear and to the middle and Hamilton Hall on right

    huger-baker-tulane

    New Baker on July 23, 2011

    baker7-23



    New Baker Hall as seen from Taft Street. Sidewalk was placed today.

    baker-taft1


    Another view of New Baker seen from Taft Street

    baker-taft2

    Preparing columns for installation

    baker-columns

    Parking garage as seen from McKinley Street with Angelle Hall to the left

    parking-angelle

    One of the McKinley Street entrances being prepared for concrete placement.

    parking-driveway


  8. Default Re: Campus Construction

    Were the old dorms supposed to be torn down before the end of the summer?


  9. #261

    Default Re: Campus Construction

    Quote Originally Posted by ULEverywhere View Post
    _ Were the old dorms supposed to be torn down before the end of the summer? _

    I think so but it looks like they are finding more Asbestos in the buildings and it is taking a long time. It won't take long to demolish them once they get started, debris removal will be the limiting factor.

  10. #262

    Default Re: Campus Construction

    More asbestos removal in Evangeline Hall. This is the building they started with asbestos removal and they have returned to it. Looks like they are back in old Baker and Huger too. They have never left Bonin once they started. Asbestos removal is a slow and tedious job that requires meticulous record keeping.

    evangeline-asbestos

    New Baker Hall on July 30, 2011. They moved in furniture last week, they are installing gutters and the entry columns, landscaping is started too. The landscape sprinkler system is being installed on the band practice field. Sprinkler heads are marked by a white pipe (like the one to the right of the dozer). Landscape sprinklers are being installed around New Baker Hall too.

    baker-july-30

    New Baker Hall as seen from Taft Street.

    baker-taft


    New Baker Hall as seen from the south east corner of the new parking garage (adjacent to Angelle Hall)

    baker-angelle

    Installing entry columns at New Baker Hall

    baker-columns

    Parking Garage July 30, 2011, Sidewalk is formed and should be placed Monday. Security fencing is almost complete on the first level.

    garage-july30

    Parking garage adjacent to the rear of Angelle Hall. Driveway to Angelle Hall is formed and should be placed Monday.

    garage-angelle

    McKinley Street entrance to parking garage next to Angelle Hall. I wonder if anybody is going to have anything to say about the color of the brick not matching? The darker brick was placed on site. It appears that the lighter brick is not brick but stained concrete (I have not been able to get close enough to see.)

    garage-mckinley-angelle


  11. #263

    Default Re: Campus Construction

    Energy efficiency project is under construction. There will be new cooling towers at the Student Union and Doucet Hall with improvements to the chilled water loop at the student union. One of the new cooling towers is to the left rear.

    energy-efficiency

    Welders work station. Must get pretty hot in the afternoon. Note asbestos laden Evangeline Hall to the rear and the roof vents that were replicated on new Baker Hall.

    welders-work-space

    The flying cantilever is the only example of anything of value on the soon to be demolished Guillory Hall. These buildings were built in 1955 and are the worst eyesore on campus.

    flying-cantilever


  12. #264

    Default Re: Campus Construction

    Certainly won't miss these buildings, you're right though I noticed the brick was not the same color the other day when I drove by. It doesn't look like a real brick facade though but rather what you said maybe a stained concrete or something. Not sure how I feel about the scale of the parking tower between the buildings. Also while it's nice to match the style of the older buildings they could have created a better design for dorms imo but the layout will be nice and these have been much needed for some time. Kudos to the University for improving in the rough times, we'll be so far ahead of other schools in the state when the economy turns around


Page 22 of 78 FirstFirst ... 12 19 20 21 22 23 24 25 32 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 8 users browsing this thread. (0 members and 8 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Acadiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •