Today I noticed that they are in the process of removing all the Air Conditioner units and some furniture from old Baker and Huger halls. I guess they are pretty confident that the new Baker Hall will be finished for the Fall semester.
Big boss says August. Just need a few more weeks of good weather and it will be about all inside for this one. One big dorm. And more coming. Parking garage will help a great deal - depending on cost!! Impressed with construction crew. Getting after it. Seems well coordinated.
Demolition of Huger, Baker, Bonin and Evageline should start soon.
The stump to the right was an Oak tree that was over 50 years old. Funny how they take these trees down when school is out. This is one they said they were going to move.
Oak tree removed from behind Bonin Hall
Plaque at entrance to old Huger hall (I hope nobody steals it)
Plaque at entrance to old Baker hall (I hope nobody steals this one too)
New Baker hall as of 5-21-11 Brick work up to the third floor level at this side of the building
New Baker as seen from Taft Street
Brick layer foreman to the left. they were setting precast concrete sections on the wall. Note the two story poles attached by "C" clamps on the walls. Story poles are used to make sure you end where you started.
Facilities will be much better, but wish we had much more land for the more landscaping.
I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.
The campus was more beautiful then, but it got pretty hot in those old buildings.
I do know that the Campus is much cleaner now. they have had prison labor on campus on Saturdays to help with the clean up. Not long after Dr. Savoie became president they did a general clean up of the buildings on campus. That was about the same time they cleaned Cajun Field. It looks much better now.
I would like to see what the landscaping will look like around the parking garage and New Baker and the Tulane Ave dorm (probably new Huger).
I think--again---- I think that in the visual that the university released--it showed some really nice seating areas with the trees and just nicely done L-scaping---With all this done so well --just know that the rest will be very much in line with the total construction package!!!!
Parking Garage as of May 28, 2011.
Two entrances on McKinley street
this one near Angelle Hall
this one near Hamilton Hall
they should be pretty close to being through with the McKinley side of the garage by the end of next week. If that happens, they will be about 50% finished with the erection of the building.
This is a view from the front yard of Hamilton Hall
They have placed temprary fencing around old Baker and Huger along with Bonin, Evangeline and Buchanan Halls. Looks like demolition should start pretty soon on Bonin, old Baker and Huger and Evageline. (Maybe next week)