Page 16 of 94 FirstFirst ... 6 13 14 15 16 17 18 19 26 ... LastLast
Results 151 to 160 of 934

Thread: Campus Construction

  1. #151
    Join Date
    Jan 2002
    Location
    Louisiana A
    Posts
    24,521

    Default Re: Campus Expansions

    Amazing.

    Thank you so much HelmutVII


    Ragin' Cajuns Roll
    #RaCaRoll

  2. #152
    Join Date
    Apr 2006
    Location
    Lafayette, LA
    Posts
    4,219

    Default Re: Campus Expansions

    this pace is incredible


  3. #153
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    6,506

    Default Re: Campus Expansions

    Quote Originally Posted by ulforlife View Post
    _ this pace is incredible _

    The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it.

  4. #154
    Join Date
    May 2002
    Location
    Lafayette, La.
    Posts
    17,643

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it. _
    Helmut, great info. We really appreciate your insight into this construction "stuff!"

    Z

  5. #155
    Join Date
    Nov 2002
    Location
    Tony Matto. Youngsville, LA
    Posts
    10,525

    Default Re: Campus Expansions

    Sure seem to be making better progress than the guys "working" on the softball stadium.


  6. #156
    Join Date
    Jan 2003
    Posts
    360

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    ...Then the roof trusses go on and the roof deck by mid to late May. Then they will be out of the weather.
    One day after you posted that, roof framing has begun. Amazing.


  7. #157
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    6,506

    Default Re: Campus Expansions

    Quote Originally Posted by ljr3721 View Post
    _ One day after you posted that, roof framing has begun. Amazing.

    _
    I see all of the diagonal bracing on the second to fourth levels. I hope they have enough, especially on the fourth level. They are predicting the potential for severe weather Monday evening into Tuesday morning. This is a particularly vulnerable time for the structure.

  8. #158
    Join Date
    Nov 2006
    Location
    E-rat, Louisiana
    Age
    39
    Posts
    650

    Default Re: Campus Expansions

    Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk.


  9. #159
    Join Date
    Jan 2003
    Location
    Abbeville, LA
    Age
    42
    Posts
    2,686

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    Sounds like decision time: give up the back half of backfield to create a loading/unloading drive straight from Taft to Angelle? Or does the band want to keep the back sideline intact for getting on/off the field? Stay tuned tomorrow to find out...same Bat Time, same Bat Channel!

  10. #160
    Join Date
    Nov 2003
    Location
    Lafayette, Louisiana
    Posts
    6,506

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    It looks like they will have all the roof trusses on and the entire exterior sheeting done by the end of the week. They will be out of the weather and really be able to go to town on the inside work.

    It looks like there will be access to the rear of Angelle Hall through the parking garage. I'm sure the Fire Marshall had something to say about that. It will probably be in combination with the drive through for the credit union. Lets hope there in not a fire in Angelle hall during this construction.

Page 16 of 94 FirstFirst ... 6 13 14 15 16 17 18 19 26 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum UpOnLA (Academics & Campus)
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •