Thread: Campus Construction

  1. Default Re: Campus Expansions

    Amazing.

    Thank you so much HelmutVII


  2. #152

    Default Re: Campus Expansions

    this pace is incredible


  3. #153

    Default Re: Campus Expansions

    Quote Originally Posted by ulforlife View Post
    _ this pace is incredible _

    The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it.

  4. #154
    Zeebart21's Avatar Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    _ The pace better be incredible because Taft Street Dorm is scheduled to be open for the Fall Semester. It will be tight, but if they keep it up, they may make it. _
    Helmut, great info. We really appreciate your insight into this construction "stuff!"

    Z

  5. #155

    Default Re: Campus Expansions

    Sure seem to be making better progress than the guys "working" on the softball stadium.


  6. #156

    Default Re: Campus Expansions

    Quote Originally Posted by HelmutVII View Post
    .Then the roof trusses go on and the roof deck by mid to late May. Then they will be out of the weather.
    One day after you posted that, roof framing has begun. Amazing.


  7. #157

    Default Re: Campus Expansions

    Quote Originally Posted by ljr3721 View Post
    _ One day after you posted that, roof framing has begun. Amazing.

    _
    I see all of the diagonal bracing on the second to fourth levels. I hope they have enough, especially on the fourth level. They are predicting the potential for severe weather Monday evening into Tuesday morning. This is a particularly vulnerable time for the structure.

  8. Default Re: Campus Expansions

    Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk.


  9. #159

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    Sounds like decision time: give up the back half of backfield to create a loading/unloading drive straight from Taft to Angelle? Or does the band want to keep the back sideline intact for getting on/off the field? Stay tuned tomorrow to find out.same Bat Time, same Bat Channel!

  10. #160

    Default Re: Campus Expansions

    Quote Originally Posted by Cajunbander View Post
    _ Does anyone know if they're going to have a pathway through the parking tower to the little alcove in Angelle Hall? I know there's no loading zone around Angelle now, and it's a pain in the ass to have to load or unload stuff. They couldn't make one by the current parking garage, because as it is now, the band field goes from the band tower right up to the sidewalk. _
    It looks like they will have all the roof trusses on and the entire exterior sheeting done by the end of the week. They will be out of the weather and really be able to go to town on the inside work.

    It looks like there will be access to the rear of Angelle Hall through the parking garage. I'm sure the Fire Marshall had something to say about that. It will probably be in combination with the drive through for the credit union. Lets hope there in not a fire in Angelle hall during this construction.

  11. #161

    Default Re: Campus Expansions

    Another week of good progress.

    All the roof trusses are on and about 25% of the roof is decked. The building has about 75% of the OSB skin on it and it should be finished Monday (Tuesday at the latest). There will not be much more to show on a weekly basis on the dorm because they will be doing a ton of work on the inside. Tulane dorm has the Geo Piles finished and they are starting on the foundation.

    You can really get a feeling of the size of the building now.

    april-9-2011

    North end of Taft Street Dorm

    taft-north

    Middle section of Taft Street Dorm

    taft-middle


    South end of Taft Street dorm

    taft-south

    Stockpiled windows (I think). It could be door frames though.

    windows


  12. #162

    Default Re: Campus Expansions

    Parking garage work as of April 9, 2011. East ramp first level concrete has been placed. Foundation work is continuing and getting closer to completion.

    parking-garage-april9

    Rigging up a Manitowoc articulated lattice boom crane. Looks like they will be getting serious with material handling next week.

    ab-crane

    Concrete test cylinders for a 150 cubic yard concrete placement.

    test-cylinders

    Parking garage foundation adjacent to Angelle Hall.

    parking-foundation

    Elevator pit for parking garage

    elevator-pit


  13. Default Re: Campus Expansions

    Helmut,

    This is probably a weird question, but what kind of attic/roof insulation goes into projects like this?


  14. #164

    Default Re: Campus Expansions

    http://www.youtube.com/watch?v=xeh9dKUAArQ

    This video outlines the master plan.


  15. #165

    Default Re: Campus Expansions

    Quote Originally Posted by fiz View Post
    _ Helmut,

    This is probably a weird question, but what kind of attic/roof insulation goes into projects like this? _
    Not a weird question at all.

    Typically either fiberglass batt or blown in. I know they are using batts in the floors and ceilings on the OK Allen project. I would suspect they would use fiberglass between floors to reduce sound transmission. They might use blown in cellulose for the walls because it goes in fairly quickly and is treated with Borax that acts as a fire and critter retardant.

Page 11 of 63 FirstFirst . 8 9 10 11 12 13 14 21 . LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Louisiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •