    Default Re: Campus Construction

    Huger hall is starting to look like a finished building. They have finished cleaning the brick work and they have the interior lights on at night. Ceiling fans are working to circulate air in the building. Here are a few shots of the exterior.

    Huger Hall as seen from Tulane ave. They have the decorative columns on site and will be installing them in the next few weeks.

    hyger-tulane

    Huger Hall as seen from Taft Street

    huger-taft

    Huger Hall as seen from the rear of Hamilton Hall

    huger-1


  2. #342

    Default Re: Campus Construction

    Plenty of work on Bonin Hall this week here a re a few photos of Bonin Demolition on Tuesday October 4, 2011

    bonin-tuesday-1

    bonin-tuesday-2

    Here are a couple of photos from Sunday October 9, 2011 from the same veiw point.

    bonin-sunday

    bonin-sunday-2

    The remains of the mechanical equipment basement of Bonin Hall

    bonin-basement

    A very old cast iron water line that is still active. Working around these lines is hard because the break with a blink of the eye. They have new water line material stock piles on the site. It looks like they are increasing the size of the lines for added supply and for fire lines.

    old-water-line


  3. #343

    Default Re: Campus Construction

    Foundation prep work for one of the new rose garden dorms.

    new-dorm-foundation

    Foundation work at another location for the same dorm.

    new-dorm-foundation-1


  4. #344

    Default Re: Campus Construction

    It looks like they will make the deadline of finishing Huger by Thanksgiving with no problems. The amount of stored materials outdoors for Huger is getting less and less each week. Any new materials delivered goes directly inside.

    They are just about finished with the Credit Union offices and they should be moving in very soon. There is very little construction equipment and material left at that site. They had students playing a game of touch football on the band field today. Once they finish Huger it will be a very nice location on campus. It feels very good walking around there.

    With homecoming this week I hope that many of you from out of town can make the trip to Lafayette because photos do not do justice to the amount of work done on these projects.


  5. #345

    Default Re: Campus Construction

    They are cleaning up around Huger Residence Hall getting ready for side walks and other outside facilities. Just a little bit of caulking and other exterior finish work left to do. Here are a few photos of Huger on the weekend of October 15. There is still plenty of interior work to do though.


    Dressing up along the north facade of Huger. Hamilton is to the right.

    huger-1

    Cleaning up to the rear of Huger. Baker Hall is to the rear of the camera.

    huger-2

    Installing subsurface drainage to the rear of Huger. Baker is to the rear of the camera.

    huger-3

    Aggregate used as a working surface during construction is being removed so dress up and other outside work can continue. Huger to the right, Baker to the left and Hamilton to the rear center.

    huger-4


  6. #346

    Default Re: Campus Construction

    Construction on the Rose Garden Halls has really taken off this week.

    Bonin Hall is gone.

    bonin-gone

    Remains of Mechanical Equipment Pit

    mechanical-pit

    Making big ones into little ones. They lift the large concrete piece as high as they can and drop it on the pile below in an attempt to break it into smaller pieces.

    big-to-little

    The ground shakes when it hits the pile. The scaffolding in the rear is for a second stair well for the first building under construction.

    big-to-little-2

    Form work for first dorm, Harris Hall and final pile of Bonin concrete is to the rear

    dorm-foundation

    First stair well to be constructed. Getting to third level of four.

    stairwell-1

    View of first stair well on Friday October 14. Harris Hall is to the rear. Photo taken from the driveway to my home.

    driveway-view


  7. #347

    Default Re: Campus Construction

    A little fun.


    Two Cypress Lake Gators.

    2-gators

    Cypress Lake gator chillin out.

    1-gator


    Cypress Lake Gator with some friends.


    gator-friends


  8. Default Re: Campus Construction

    Being so close, how was the noise when the buildings were being torn down?

    Thanks again by the way.


    Geaux Cajuns

  9. #349

    Default Re: Campus Construction

    Demolition noise was no big deal since I'm at work every Monday to Friday. They do work on weekends but they didn't start until about 8:30 or 9:00 A.M. They shut down about 5:30 or 6:00 in the afternoon. The big problem is dust. It gets everywhere and its constant. It's nothing that a good rain wouldn't cure though.


  10. #350

    Default Re: Campus Construction

    Clean up around Huger has continued this week.

    The entrance to Huger is getting close.

    huger-2

    Forming for sidewalks on the side of Huger has started. Hamilton Hall to the right. New parking garage to the rear.

    huger-1

    Removal of construction aggregate continues and is almost finished. Hamilton Hall is to the rear.

    huger3

    Drainage work and dress up to the rear of Huger. Baker is to the right.

    huger-4


Page 35 of 94 FirstFirst ... 25 32 33 34 35 36 37 38 45 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA (Academics)
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum ViewMy Recipe
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •