Page 17 of 78 FirstFirst ... 7 14 15 16 17 18 19 20 27 ... LastLast
Results 193 to 204 of 934

Thread: Campus Construction

  1. #193

    Default Re: Campus Construction

    Parking Garage as of 5/08/11. This will be a very imposing building. some may not like it because it will be out of proportion to other buildings on campus.
    Garage-5-08

    East ramp structure taking shape.
    Garage-East-ramp

    View of parking garage from Tulane Ave.
    garage-tulane

    West ramp of parking garage
    Garage-west-ramp

    Korbels sticking out to support ramps for the parking garage. The ramps will be on the interior of the building with the exterior floors level. You will see each floor as level from the outside.
    Garage-Korbels

    Counterweights on the crane used to lift precast concrete sections.
    Garage-counter-weights


  2. #194

    Default Re: Campus Construction

    January 2, 2011
    demo-1

    May 8, 2011
    Baker-5-08


    January 2, 2011

    demo3

    May 8, 2011
    Garage-5-08


  3. Default Re: Campus Construction

    Wow

    Thanks


  4. Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Parking Garage as of 5/08/11. This will be a very imposing building. some may not like it because it will be out of proportion to other buildings on campus.


    View of parking garage from Tulane Ave.
    garage-tulane
    You are not kidding. It's already kind of imposing in this picture.

  5. #197

    Default Re: Campus Construction

    Consistent progress through the week. Brick work has started in earnest this week and has progressed above the bottom of the second floor windows. More interior work being done.
    baker-5-14


    Close up of the brick work

    baker-brick


    Tulane avenue dorm as of 5-14. Just placed concrete this morning.

    tulane-dorm5-14


  6. #198

    Default Re: Campus Construction

    Parking Garage as of 5-14

    Garage-5-14

    Parking Garage from McKinley

    garage-mc-kinley

    Parking garage from Tulane Avenue
    garage-tulane-2

    The parking garage will be a huge structure.


  7. #199

    Default Re: Campus Construction

    Today I noticed that they are in the process of removing all the Air Conditioner units and some furniture from old Baker and Huger halls. I guess they are pretty confident that the new Baker Hall will be finished for the Fall semester.


  8. #200

    Default Re: Campus Construction

    Quote Originally Posted by HelmutVII View Post
    _ Today I noticed that they are in the process of removing all the Air Conditioner units and some furniture from old Baker and Huger halls. I guess they are pretty confident that the new Baker Hall will be finished for the Fall semester. _
    Big boss says August. Just need a few more weeks of good weather and it will be about all inside for this one. One big dorm. And more coming. Parking garage will help a great deal - depending on cost!! Impressed with construction crew. Getting after it. Seems well coordinated.

  9. #201

    Default Re: Campus Construction

    Demolition of Huger, Baker, Bonin and Evageline should start soon.

    Huger-baker-bonin

    The stump to the right was an Oak tree that was over 50 years old. Funny how they take these trees down when school is out. This is one they said they were going to move.

    baker-bonin-evangeline

    Oak tree removed from behind Bonin Hall
    bonin-tree

    Plaque at entrance to old Huger hall (I hope nobody steals it)

    huger-plaque

    Plaque at entrance to old Baker hall (I hope nobody steals this one too)baker-plaque


  10. #202

    Default Re: Campus Construction

    New Baker hall as of 5-21-11 Brick work up to the third floor level at this side of the building

    new-baker-4-21

    New Baker as seen from Taft Street

    new-baker-1

    Brick layer foreman to the left. they were setting precast concrete sections on the wall. Note the two story poles attached by "C" clamps on the walls. Story poles are used to make sure you end where you started.

    brick-foreman


  11. #203

    Default Re: Campus Construction

    Parking Garage as of 5-21-11

    parking-garage-5-21

    One of the Mc Kinley street entrances. I was hoping they would have an arch somewhere on this building as there is an arch on almost all of the buildings on campus.

    parking-garage-mc-kinley

    Parking garage as seen from the front of Hamilton Hall

    parking-garage-hamilton


  12. #204

    Default Re: Campus Construction

    Facilities will be much better, but wish we had much more land for the more landscaping.

    I sometimes took classes in what was then called "little abbeville," the wooden buildings built during WWII at the back of campus.

    The campus was more beautiful then, but it got pretty hot in those old buildings.


Page 17 of 78 FirstFirst ... 7 14 15 16 17 18 19 20 27 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Acadiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •