    _ I know its just pictures of construction and descriptions that I don't always 100% understand, but for some reason I'm absolutely hypnotized by these updates and I get really excited every time a new one comes up.

    Thanks again Helmut. _
    Thank you very much. I am interested in the project not only because it involves the University but I went to Hamilton Lab School (now Hamilton Hall) first through eight grade. I saw Denbo, Bancroft and for that matter Angelle constructed during my years at the school. Many fond memories of my times spent on that play ground. Also I was in the Pride of Acadiana and spent many an hour out on the same grounds.

    Being an Engineer it is also very interesting to watch the construction. (I had no involvement in the design of this project) Generally, it is very satisfying to watch a project I may have envisioned in my head and then transferred to paper and then actually be constructed and completed. Eventually people will use the project whether, whether it be used to get to and fro; to live in or on; or to provide basics for a civilized life. (that's why they call it "Civil" Engineering). The people who use a project daily have no idea who designed the project nor do they have any idea what was involved in building the project. For me I like it that way. I feel sorry for the people that designed this particular project because they are no where near here and can't follow the project on a daily basis.

    It was, and still is, my intention to chronicle the project on a weekly basis from the beginning to the end. I typically take the photographs and post on Saturday.

  2. #182

    Default Re: Campus Construction

    Excuse the construction pun...but i'm riveted by this thread.


  3. Default Re: Campus Construction

    Quote Originally Posted by CroCajun1003 View Post
    _ Excuse the construction pun...but i'm riveted by this thread. _
    Yea but who "SCREWED UP" the Lamson Project?????

  4. #184

    Default Re: Campus Construction

    Quote Originally Posted by Boomer View Post
    _ Yea but who "SCREWED UP" the Lamson Project????? _
    I don't know. Probably some tool.

  5. #185

    Default Re: Campus Construction

    Another week of good progress. they have continued to erect scafolding for brick work and they have their first load of bricks delivered.
    april30-2011


    North end of Baker Dorm
    baker-north


    South end of Baker dorm
    baker-south


    Baker dorm from Tulane Ave.
    baker-tulane


    Tulane Ave dorm stair wells and elevator shafts under construction.
    tulane-dorm


  6. #186

    Default Re: Campus Construction

    Parking Garage as of April 30, 2011 another good week of progress.
    Parking-garage-4-30


    East side ramps taking shape
    east-ramps


    Parking Garage from Tulane Ave
    garage-tulane

    Parking Garage Close up
    garage-close-up

    Another close up
    garage-close-up-2PICT0114


    New Credit Union offices.
    credit-union


  7. #187

    Default Re: Campus Construction

    thanks helmut,
    i was curious where the tilt panels at cajun field had disappeared to.


  8. Default Re: Campus Construction

    I went and took some pictures today of the construction. Its amazing, its like the parking tower is a big, real life Lego set. They lift a section, put it in place, attach it, then move on to the next one, everything has a specific place and locks in to the other pieces. Being a fan of Legos when I was a kid, it's really cool to watch.




    Some more pictures I took today of the construction:
    http://www.facebook.com/media/set/?s...57521.47907792


  9. #189

    Default Re: Campus Construction

    this parking garage design looks better than the taft st one, any info on that helmet?


  10. Default Re: Campus Construction

    Quote Originally Posted by ulforlife View Post
    _ this parking garage design looks better than the taft st one, any info on that helmet? _
    It looks like the new one's going to be bigger, taller, and like the parking tower downtown. What I mean, is that it looks like the floors will be level and there will be up and down ramps, instead of the parking space itself being slanted to get up and down like the one there already.

  11. #191

    Default Re: Campus Construction

    Tulane Avenue dorm slab as of 5/08/11 if they are consistent, this Dorm will be named Huger. Looks like they will place concrete after the stairwells are finished
    Tulane-slab

    Tulane Ave dorm stairwell
    tulane-stariwell


  12. #192

    Default Re: Campus Construction

    Baker Dorm as of 5/08/11. Looks like they have the first few courses of brick around a good part of the building and will start brick work in earnest this week.
    Baker-5-08

    North end of Baker Dorm
    Baker-North

    South end of Baker Dorm
    Baker-South

    View of Baker dorm from Tulane Ave.
    Baker-Tulane

    Story pole used by brick layers to assure a level brick course around the building and that headers over windows and doors are at the same level. Brick layers don't like you messing with this.
    Baker-story-pole


Page 16 of 78 FirstFirst ... 6 13 14 15 16 17 18 19 26 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 3 users browsing this thread. (0 members and 3 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum Eats Acadiana
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •