    _ I saw some light towers placed near the McKinley street end of the parking garage last night on my walk. I figured they would be placing concrete for the Parking garage foundation early this morning. I woke up at a bout 3:00 A.M. this morning and heard a fairly steady stream of concrete trucks on University Ave. So I guess they did place some of the foundation this morning. Good thing as we are expecting rain this afternoon into tomorrow. _
    My friend lives in the house directly across Taft from the field, and he says that they're out most nights doing something.

  2. #132

    Default Re: Campus Expansions

    An amazing day today. No work being done after 2" of rain yesterday.

    An overview of work as of March 6, 2011

    march-6

    North end of Taft Street dorm showing second floor decking.


    framing1

    Middle section of Taft Street dorm with Denbo debris pile in background.

    framing2

    South end of Taft Street dorm almost ready for decking.

    framing-3

    The size of the building is starting to show now. If you can imagine this amount of framing 3 more times you can get the idea. Kind of hard to show in photographs though.



    Bancroft slab and foundation below is all that remains

    bancroft-slab



    Parking garage work site after 2" of rain on March 5, 2011. It will be a mess tomorrow when they continue working.

    parking-garage


    A portion of the foundation placed on Friday morning March 4, 2011

    parking-foundation


  3. #133

    Default Re: Campus Expansions

    Work being done on March 12, 2011

    Clockwise from left. Second floor framing, Bancroft foundation demolition


    mar-12-2011

    Second floor framing of North end of Taft Street Dorm. Yellow rods at the top of the stud walls are for OSHA required railings needed when decking the third floor.

    taft-north

    Middle section of Taft Street Dorm.

    taft-middle

    Second floor of South end of Taft Street Dorm getting decked.
    taft-south

    Breaking up Denbo Foundation

    concrete-breaker

    Debris pile of Bancroft foundation, looks like they are removing everything down to about 4 or 5 feet below ground level. The round pieces of concrete are the tops of the piling for Bancroft. The materials in foreground are truss joists for the second floor ceiling of the Taft Street Dorm.

    truss-joists


  4. #134

    Default Re: Campus Expansions

    Parking garage work on March 12, 2011

    Rod busting to the right, foundation excavation in the middle and concrete placement to the left.

    p-garage-mar-12-2011

    Rod Busting for the Parking garage foundation

    rod-busting

    Excavation for the Parking garage foundation

    foundation-excavation

    Placing concrete for the Parking garage foundation
    placing-concrete


  5. Default Re: Campus Expansions

    I was taking pictures of the site yesterday as well. I ran into one of the crew at the top of the stairs and he was saying they've been coming in and taking aerial shots of the site on a regular basis. I didn't think to ask him if they were or would be posting them somewhere online. It'd be cool to see.


  6. Default Re: Campus Expansions

    Thanks for all the updates.

    Very fun to see.
    igeaux.mobi


  7. #137

    UL Softball Re: Campus Expansions

    Quote Originally Posted by Turbine View Post
    _ These guys can work.

    Softball got the shaft . . . the other one _
    The First Softball crew issued the Shaft .........the crew they have now has been doing great!!!

  8. #138

    Default Re: Campus Expansions

    Overview of work as of March 19, 2011 More framing on Taft Street Dorm, final debris removal of Denbo and site prep for Tulane Ave Dorm (8912)

    overview-3-19-11


    North end of Taft Dorm, 3rd floor decking should start soon.
    taft-north


    Middle section of Taft Street Dorm
    Taft-middle


    South End of Taft Street Dorm
    Taft-south


    D. H. Griffin Demolition equipment running out of things to do.
    d-h-griffin


    Last pile of debris from Denbo demolition
    last-debris


    Wind rowing soil to dry it out. Starting to do site prep on the north end of Tulane Ave. Dorm.
    wind-row


  9. #139

    Default Re: Campus Expansions

    Parking garage work as of March 19, 2011

    Major foundation work is just about complete,

    parking-garage


    First level parking pad. Stacks of insulated pipe are for chilled water for AC to credit union (I guess).
    1st-floor-parking


    New Credit Union location
    new-credit-union


    Layout lines for foundation walls in Parking garage.

    layout


  10. #140
    Zeebart21's Avatar Zeebart21 is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever

    Default Re: Campus Expansions

    That is awesome progress. Can we maybe send just 2 of those guys to finish the softball field??

    Z


Page 14 of 94 FirstFirst ... 4 11 12 13 14 15 16 17 24 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. Is that a construction cam?
    By Cajun_RH in forum Up On LA (Academics)
    Replies: 530
    Last Post: August 29th, 2014, 01:12 pm
  2. UL Campus: Campus Copies cheap, delicious
    By NewsCopy in forum ViewMy Recipe
    Replies: 0
    Last Post: September 21st, 2011, 01:56 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •