An amazing day today. No work being done after 2" of rain yesterday.
An overview of work as of March 6, 2011
North end of Taft Street dorm showing second floor decking.
Middle section of Taft Street dorm with Denbo debris pile in background.
South end of Taft Street dorm almost ready for decking.
The size of the building is starting to show now. If you can imagine this amount of framing 3 more times you can get the idea. Kind of hard to show in photographs though.
Bancroft slab and foundation below is all that remains
Parking garage work site after 2" of rain on March 5, 2011. It will be a mess tomorrow when they continue working.
A portion of the foundation placed on Friday morning March 4, 2011
![]()
Work being done on March 12, 2011
Clockwise from left. Second floor framing, Bancroft foundation demolition
Second floor framing of North end of Taft Street Dorm. Yellow rods at the top of the stud walls are for OSHA required railings needed when decking the third floor.
Middle section of Taft Street Dorm.
Second floor of South end of Taft Street Dorm getting decked.
Breaking up Denbo Foundation
Debris pile of Bancroft foundation, looks like they are removing everything down to about 4 or 5 feet below ground level. The round pieces of concrete are the tops of the piling for Bancroft. The materials in foreground are truss joists for the second floor ceiling of the Taft Street Dorm.
![]()
I was taking pictures of the site yesterday as well. I ran into one of the crew at the top of the stairs and he was saying they've been coming in and taking aerial shots of the site on a regular basis. I didn't think to ask him if they were or would be posting them somewhere online. It'd be cool to see.
Thanks for all the updates.
Very fun to see.
igeaux.mobi
Overview of work as of March 19, 2011 More framing on Taft Street Dorm, final debris removal of Denbo and site prep for Tulane Ave Dorm (8912)
North end of Taft Dorm, 3rd floor decking should start soon.
Middle section of Taft Street Dorm
South End of Taft Street Dorm
D. H. Griffin Demolition equipment running out of things to do.
Last pile of debris from Denbo demolition
Wind rowing soil to dry it out. Starting to do site prep on the north end of Tulane Ave. Dorm.
![]()
That is awesome progress. Can we maybe send just 2 of those guys to finish the softball field??