Work being done on March 12, 2011
Clockwise from left. Second floor framing, Bancroft foundation demolition
Second floor framing of North end of Taft Street Dorm. Yellow rods at the top of the stud walls are for OSHA required railings needed when decking the third floor.
Middle section of Taft Street Dorm.
Second floor of South end of Taft Street Dorm getting decked.
Breaking up Denbo Foundation
Debris pile of Bancroft foundation, looks like they are removing everything down to about 4 or 5 feet below ground level. The round pieces of concrete are the tops of the piling for Bancroft. The materials in foreground are truss joists for the second floor ceiling of the Taft Street Dorm.