peanutmanOriginally posted by peanutman
Between last night and this morning, I was able to complete the cement (3 base side) from the ice machine around the peanut stand up to the club house and the stairs leading up to the 3 base bleachers. I also pressure washed the field side of the brick backstop between the dugouts. There is still a small section in front of the concession stand and the wrap around walkway on the 1st base side.
One gas can is empty and the other only has about 1/4 left (or less). Most of the hoses are in the 3 bas dug out.
A couple of people stopped by said that they would try to come out Sunday.
There is still a ton left to do, so anyone with some spare time and a pressure washer come on out.