Results 1 to 3 of 3

Thread: Construction at Lady Cajun Park

  1. UL Softball Construction at Lady Cajun Park

    Work is happening. The foundation looks like it is ready to be bolted to.

    If the stands are preasembled those aluminum frames would have to be stairs to connect the stands, otherwise it looks like there will be no preassembled stands.

    The field is ready for fall softball on Fri, Oct 15

    Attached Images Attached Images        

  2. #2

    Default Re: Construction at Lady Cajun Park

    It will go together pretty quickly if the foundations are laid out and constructed in the right place. One little mess up with the foundation could set them back though.


  3. #3

    Default Re: Construction at Lady Cajun Park

    Just a few more from yesterday. It looks like all of the steel is on site, and the concrete looks all poured.
    Rumor has it that they may start stacking steel by the end of the week.

    edit. After looking at the area today, I still think they have a good bit of concrete to pour. Based on the footings that will be at the back of the stands, I'm assuming they'll have to pour about another 25-30' of concrete outside the brick wall shown.


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 0
    Last Post: May 30th, 2008, 05:27 am
  2. Lady Cajun Park
    By Turbine in forum RECORDedit
    Replies: 0
    Last Post: May 22nd, 2002, 05:48 am

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •