Still ahead of schedule?
Still ahead of schedule?
August
Just to give more information on the east side construction project. I don’t want this post to sound like an “I know something you don’t know”.
I sat through a one hour presentation/rendering of what UL is proposing for the Kinesiology/Hospitality upgrade of the east side. The structure that is being proposed will consist of 4 levels at roughly 66K sf. It will basically be built into the “levee” on that side. Ground floor will have a kitchen area and RCAF offices, next level up(even with top of stands) will be a dining area for our student athletes and concessions and restrooms, next up a club area then at the top will be the press box and athletic offices.
Lots of windows to look out on the field and architecturally it will have the same type of arches like the west side and The Tigue.
Roughly a 30-35M project which will be dependent on the state’s capital outlay budget with UL having to provide funding for those areas not considered academic areas(press box for instance).
Just remember this is the first rendering and you go from there depending on the $$$ situation.
There are currently 15 users browsing this thread. (0 members and 15 guests)