Page 1 of 3 1 2 3 LastLast
Results 1 to 12 of 34

Thread: I-49 update

  1. UL Football I-49 update

    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.


  2. #2

    Default Re: Demo party 12/11

    Quote Originally Posted by ZoomZoom View Post
    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.
    Thanks for that. I was wondering what the progress is for the project, but never go out that way much anymore. That will be really nice once it is done.

    Now if we can only see construction of the Connector in the near (relatively speaking) future I can die a happy man.

  3. #3

    Default Re: Demo party 12/11

    Quote Originally Posted by ZoomZoom View Post
    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.
    It might be a test pile. We're there 4 reaction piles driven next to it? Looks like they are fast tracking this one. If they are driving piling before any embankment is placed. The west side service road is better than the old lane of 90 it replaced.

    Prestressed concrete beams have come a long way. Let's hope they don't screw up their deflection calculations when they place the concrete deck. Some of the overpasses headed to Morgan City are like washboards

  4. #4

    Default Re: Demo party 12/11

    Quote Originally Posted by ZoomZoom View Post
    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.
    It might be a test pile. We're there 4 reaction piles driven next to it? Looks like they are fast tracking this one. If they are driving piling before any embankment is placed. The west side service road is better than the old lane of 90 it replaced.

    Prestressed concrete beams have come a long way. Let's hope they don't screw up their deflection calculations when they place the concrete deck. Some of the overpasses headed to Morgan City are like washboards

  5. #5

    Default Re: Demo party 12/11

    If anyone has any updated pictures please post. Thanks.


  6. #6

    Default Re: Demo party 12/11

    Quote Originally Posted by JMV JustMyView View Post
    If anyone has any updated pictures please post. Thanks.
    Not for you

  7. #7

    Default Re: Demo party 12/11

    Quote Originally Posted by HelmutVII View Post
    Some of the overpasses headed to Morgan City are like washboards
    Disaster.

  8. #8

    Default Re: Demo party 12/11

    Quote Originally Posted by Swamp View Post
    Disaster.
    No doubt.

  9. #9

    Default Re: Demo party 12/11

    Quote Originally Posted by JMV JustMyView View Post
    If anyone has any updated pictures please post. Thanks.
    I took a bunch just this a.m. and will be posting soon. Plus, a ‘bonus’ pic.

  10. #10

    Default Re: I-49 update

    Quote Originally Posted by ZoomZoom View Post
    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.
    Not a high jack, but you got a thread split started lol

  11. #11

    Default Re: I-49 update

    Quote Originally Posted by ZoomZoom View Post
    Not a high jack, just an infrastructure FYI. Saw the first piling being driven for the main overpass 90 @ Ambassador today. And horizontal roadbed beams being installed for southbound service road over BNSF tracks. A benefit from the drought, making good time. Back to the stadium.
    I passed by about lunch time today. The piling are indeed permanent. It looks like they will build the overpass with minimal embankment. This should go pretty quick.

  12. Default Re: I-49 update

    What’s the plan for the Evangeline Thruway? Overpass, or a completely different route from the Ambassador Caffery 90 intersection


Page 1 of 3 1 2 3 LastLast

Thread Information

Users Browsing this Thread

There are currently 4 users browsing this thread. (0 members and 4 guests)

Similar Threads

  1. Wooldridge update
    By JayWalker in forum RagePage
    Replies: 45
    Last Post: November 25th, 2023, 11:23 pm
  2. QB Club Update
    By Cajunsmike in forum Football
    Replies: 1
    Last Post: September 22nd, 2023, 12:47 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •