    Early in the thread, MAT said he spoke to engineers that estimated it would take $10-12 million to renovate Blackham, which (he said) was also the cost of the Cajundome renovation.

    If memory serves me correct, the Cajundome renovation was actually over $20 million.

    And that was really just internal re-arranging; nothing structural.

    But renovating Blackham would seem to involve a much greater effort. I would imagine a building built in 1950 would pretty much require a complete gutting of the facility, and would cost considerably more than $10 million.

    I'm pretty sure you're an engineer. Care to make a guess on what the cost might be?
    My apologies. That $12 million figure may have been something more specific. Might have been the initial proposal. Not sure why I remembered that way. Here is a list of what was done and costs.

    What can you do with $22 million and six months? Give the Cajundome a complete makeover.

    Some of the renovations are immediately seen, such as the new seats in the arena and the new coating on the arena roof.

    Others are less visible but equally important, such as the upgraded fire protection system and the enhanced electrical system.

    These are the renovations that took place during the Cajundome renovation closure from May to November.

    1. The south lobby concession stands were renovated and upgraded to include equipment to grill and fry on site, providing an enhanced menu selection.

    2. The ceiling in the south lobby was elevated from about 8 feet to 12 feet.

    3. The ground-level restrooms were renovated.

    4. The first-aid room was moved to the south lobby for greater visibility and access.

    5. All ground-level interior doors were replaced.

    6. University of Louisiana at Lafayette graphics were installed in the south lobby, upper concourse and lower concourse.

    7. Graphics that tell the history of UL basketball were installed in the lower concourse.

    8. A hallway was installed from the arena to the east and west ground-level restrooms to ease wait times at the south lobby restrooms.

    9. Half of the retractable seating was converted to permanent seating to install portals beneath seats.

    10. All seats in the arena were replaced.

    11. The arena lighting system was replaced with an LED lighting system.

    12. The arena sound system was upgraded.

    13. The scoreboard and video screens were refurbished.

    14. Extra seats were installed behind each basketball goal.

    15. A new seating bowl effect was created for UL basketball games.

    16. The entire interior of the arena was repainted in a black and gray theme.

    17. Handrails were installed on the arena steps from the lower to the upper levels.

    18. Thirty-seven TVs were installed throughout the concourse and south lobby to live broadcast arena events.

    19. The basketball court was resurfaced using UL's Cypress Lake as the theme.

    20. New basketball goals were installed.

    21. The fire protection system was upgraded and completely replaced.

    22. The electrical system was enhanced.

    23. All hallway, lobby and restroom lights were replaced with an LED lighting system.

    24. The basketball TV lighting system was replaced with digital LED lights that are brighter and more concentrated on the court.

    25. The seating capacity for basketball games was increased by 1,000.

    26. The concert seating capacity was increased by 500 to 800.

    27. New signage and a wayfinding system were installed.

    28. Ribbon boards were relocated from behind goals to east and west of the basketball court.

    29. The arena roof and metal roof were cleaned and recoated.

    30. The upper-level concession stands and restrooms will be renovated (in progress).

    Here is a breakdown of how the $22,175,000 was spent.

    $5 million: lower level permanent seating structure
    $4 million: seating replacement
    $2 million: HVAC mechanical replacements and upgrades
    $1.85 million: project design, management and administration
    $1.7 million: fire protection systems
    $1.1 million: dome and metal roof recoating
    $1 million: concession stand renovations in the south lobby
    $1 million: concession stand and restroom renovations on the upper level
    $975,000: signage, wayfinding, graphics
    $750,000: restroom renovations on the lower level
    $700,000: electrical and lighting upgrades
    $650,000: arena lighting replacement
    $650,000: concession equipment
    $300,000: audio/visual upgrades
    $300,000: painting
    $200,000: handrails

  2. Default Re: #RenovateBlackham

    When I have time, I'll dissect this list. A lot of if, we wouldn't do in Blackham. But there would be added costs that we would need to account for.


  3. #93

    Default Re: #RenovateBlackham

    https://gozags.com/facilities/mccart...letic-center/1

    Build this instead right where Blackham sits!!!


  4. Default Re: #RenovateBlackham

    Quote Originally Posted by Cajun Monkee View Post
    Early in the thread, MAT said he spoke to engineers that estimated it would take $10-12 million to renovate Blackham, which (he said) was also the cost of the Cajundome renovation.

    If memory serves me correct, the Cajundome renovation was actually over $20 million.

    And that was really just internal re-arranging; nothing structural.

    But renovating Blackham would seem to involve a much greater effort. I would imagine a building built in 1950 would pretty much require a complete gutting of the facility, and would cost considerably more than $10 million.

    I'm pretty sure you're an engineer. Care to make a guess on what the cost might be?
    Probably level it and start over would be the final plan. Water inside the building in pedestrian’s areas was always an issue when it rained

  5. #95

    Default Re: #RenovateBlackham

    Quote Originally Posted by cajun4life View Post
    https://gozags.com/facilities/mccart...letic-center/1

    Build this instead right where Blackham sits!!!
    Costed 25 mil in 2003.

    35 mil in 2023

  6. #96

    Default Re: #RenovateBlackham

    ...

    Attached Images Attached Images

  7. #97

    Default Re: #RenovateBlackham

    ODU's arena seems perfect


  8. Default Re: #RenovateBlackham

    Quote Originally Posted by JamesTheJeweler View Post
    ...
    Heck, we can’t even raise the supposed inflation costs of CF.

  9. #99

    Default Re: #RenovateBlackham

    Renovate historic Blackham Coliseum or rename it for whoever the largest benefactor is to finance it. Agree with Cajun Mike that no more than 6,000 seating is perfect size for our program. Need some suites in this modern day and age. Instead of building new Performing Arts venue just convert part of the Cajundome into accommodating the (3K seating?) and strategize use of remaining the space for the university/city. This is an inflection point to raise the discussion since the Performing Arts venue site is being kicked around across from Cajundome. Repurpose the Cajundome, lots of possibilities. It was built as multipurpose facility but doesn't mean you have to play basketball there. Basketball can skedaddle just down the road to Powerball Donor Blackham.


  10. Default Re: #RenovateBlackham

    Quote Originally Posted by CajunNation View Post
    I can tell you this. Admin has never had meetings to discuss going Indy. Within the the last couple of years, they HAVE had meetings to discuss renovating Blackham.
    The bird didn't mention this? Tweet, Tweet.

Page 10 of 29 FirstFirst ... 7 8 9 10 11 12 13 20 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •