Page 2 of 110 FirstFirst 1 2 3 4 5 12 ... LastLast
Results 13 to 24 of 1310

Thread: Cajun Field Construction

  1. #13

    Default Re: Cajun Field Construction

    Quote Originally Posted by SMD7636 View Post
    Crickets from the administration or RCAF No one has asked me to donate to the athletic facility master plan or Cajun Field specifically.
    They are going after big donors for the Cajun Field renovation and pulling in big bucks. They wouldn't raise anywhere close to enough by asking us for the money.

  2. #14

    Default Re: Cajun Field Construction

    Quote Originally Posted by ZoomZoom View Post
    Before I post my thought, I’ve had CDS myself recently.

    It is January 16th. Many of us have been told late spring/early summer for Cajun Field renovation to commence. January 16th…less than a month past the winter solstice. We’re not close to late spring.

    About 7 mill was needed when I was told the time frame. We’ve since had Macro Oil come on board. I would think each donor wants their “moment in the sun” with their gifting, so it appears they’re on track. Maggard sent out info to people in the UD. To go back on that would be a career killer P5 wise.

    I’m not concerned about crowds size in any sport since the Covid mess started. Know people on both side of the fence of personal impact of Covid. If I had a family member struggle/expire due to Covid, odds are crowds would not be my thing. God has blessed many of us so far on that front.

    We will be ok. Tonight I’m sure Maggard and RCAF has things under control.

    Geaux Cajuns.
    Nice, well thought out post. I believe it to be quite accurate as well.

  3. Default Re: Cajun Field Construction

    Quote Originally Posted by cjr3888 View Post
    They are going after big donors for the Cajun Field renovation and pulling in big bucks. They wouldn't raise anywhere close to enough by asking us for the money.
    Shortsighted.

    Get em and in the pipeline, you never know when someone in the pipeline strikes it and has an itch.

  4. #16

    Default Re: Cajun Field Construction

    Quote Originally Posted by Turbine View Post
    Shortsighted.

    Get em and in the pipeline, you never know when someone in the pipeline strikes it and has an itch.
    That’s why the outreach is needed for recent grads. Not specifically for stadium construction but to build the base.

  5. Default Re: Cajun Field Construction

    Quote Originally Posted by cjr3888 View Post
    That’s why the outreach is needed for recent grads. Not specifically for stadium construction but to build the base.
    Well that’s gotta be at least a break even on cash flow.

  6. #18

    Default Re: Cajun Field Construction

    Quote Originally Posted by moorecajun View Post
    Nice, well thought out post. I believe it to be quite accurate as well.
    Thank you sir. View is wonderful away from the ledge.

  7. #19

    Default Re: Cajun Field Construction

    Everyone but us.....great job Memphis.

    http://gofos.co/3sAj6ki


  8. #20

    Default Re: Cajun Field Construction

    Quote Originally Posted by Geaux View Post
    Everyone but us.....great job Memphis.

    http://gofos.co/3sAj6ki
    Louisiana has 1 fortune 500 company left in the entire state (in North LA).

    Memphis has 3 within its city limits, with one in the Fortune 50.

    Even so, would be a hard sell to deep pockets to invest up to $200 million in a stadium in a program that could be left out of the P5 conferences, and in this potential era of decline in CFB with all of the flux going on.

  9. #21

    Default Re: Cajun Field Construction

    Quote Originally Posted by RedTails View Post
    Louisiana has 1 fortune 500 company left in the entire state (in North LA).

    Memphis has 3 within its city limits, with one in the Fortune 50.

    Even so, would be a hard sell to deep pockets to invest up to $200 million in a stadium in a program that could be left out of the P5 conferences, and in this potential era of decline in CFB with all of the flux going on.
    Its been crickets from the university on where the CF reno stands...Does anyone have an update? My guess is the original 65 Mil budget is now 70 plus for the same design. Prices only going to go up.

  10. Default Re: Cajun Field Construction

    Quote Originally Posted by no1cajunfan View Post
    Its been crickets from the university on where the CF reno stands...Does anyone have an update? My guess is the original 65 Mil budget is now 70 plus for the same design. Prices only going to go up.
    Current inflation is greater than that.

  11. #23

    Default Re: Cajun Field Construction

    We're currently in the silent fundraising stage...

    Seriously...i think some people at UL need to start thinking creatively about this....


  12. Default Re: Cajun Field Construction

    Quote Originally Posted by fanof71 View Post
    We're currently in the silent fundraising stage....
    Sigh... 'lent' past tense of lend.

    'Lend me some money but don't tell nobody.'

Page 2 of 110 FirstFirst 1 2 3 4 5 12 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 7 users browsing this thread. (0 members and 7 guests)

Similar Threads

  1. Construction at Lady Cajun Park
    By Turbine in forum Softball
    Replies: 2
    Last Post: October 5th, 2010, 11:47 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •