Page 31 of 88 FirstFirst . 21 28 29 30 31 32 33 34 41 . LastLast
Results 451 to 465 of 1310

Thread: Cajun Field Construction

  1. #451

    Default Re: Cajun Field update

    With the Heymann Center moving to the area, I'd love to see something like this. It would solve all of our parking issues.

    Name:  walkway.jpg
Views: 384
Size:  169.4 KB


  2. #452

    Default Re: Cajun Field update

    Quote Originally Posted by MelRock View Post
    Don't be surprised when the final project looks nothing like the artist's renderings.
    An improved stadium is happening.
    Understand you can't share specific details, but, in your opinion, do you consider the final project look to be better than the renderings ?

  3. #453

    Default Re: Cajun Field update

    I cringe every time a tunnel is brought up as an infrastructure solution in south Louisiana.


  4. #454

    Default Re: Cajun Field update

    Quote Originally Posted by Rainman66 View Post
    Understand you can't share specific details, but, in your opinion, do you consider the final project look to be better than the renderings ?
    Honestly, I can not share specific details because I do not know all of the details, and I do not wish to be inaccurate. Better is in the eye of the beholder. I just know it will be different. Sorry, hopefully, they will put the details out soon.

  5. Default Re: Cajun Field update

    Quote Originally Posted by ljr3721 View Post
    With the Heymann Center moving to the area, I'd love to see something like this. It would solve all of our parking issues.

    Name:  walkway.jpg
Views: 384
Size:  169.4 KB
    OH my!

    I had thought of a parking tower over Congress & CD Blvd, but I like your idea much better as a visual hub of activity.

  6. #456

    Default Re: Cajun Field update

    Quote Originally Posted by RedTails View Post
    Any details you could spare? I’m gonna close my lil eyes, Rose.
    It's like you flying.ehh! Fly Rose!

  7. #457

    Default Re: Cajun Field update

    Quote Originally Posted by Million$Mullet View Post
    I believe they mean another tunnel to get inside the stadium. Not a tunnel that goes under congress.
    Ahhh. That makes sense .

    Both would be even better lol

  8. #458

    Default Re: Cajun Field update

    Quote Originally Posted by MelRock View Post
    Unfortunately not, they should be releasing more details in the fall.
    Not even for some Stagg Jr??!!!?

  9. #459

    Default Re: Cajun Field update

    Photo

    Attached Images Attached Images  

  10. Default Re: Cajun Field update

    "It's Looking Good"


  11. Default Re: Cajun Field update

    “How can you tell.”


  12. #462

    Default Re: Cajun Field update

    Quote Originally Posted by RedTails View Post
    Not even for some Stagg Jr??!!!?
    We might be able to have a conversation.

  13. #463

    Default Re: Cajun Field update

    Quote Originally Posted by Turbine View Post
    So no structural changes on the student side?
    I’m not spilling the beans, but I will share publicly available information.

    1. No structural changes are scheduled for the student side this year.

    2. If you look at the “PMAC renovations” thread, cjr3888 was nice enough to post all the items included in the spending bill for UL. This one stands out to me:

    -Kinesiology, Hospitality Management, and Athletic Administration Complex, Engineering, Stabilization, Equipment, Planning and Construction
    Priority 1- $15,000,000
    Priority 5 - $22,000,000

    What a strange mix of facilities. Where would you put a building like this?

  14. Default Re: Cajun Field update

    Quote Originally Posted by CajunRebel View Post
    I’m not spilling the beans, but I will share publicly available information.

    1. No structural changes are scheduled for the student side this year.

    2. If you look at the “PMAC renovations” thread, cjr3888 was nice enough to post all the items included in the spending bill for UL. This one stands out to me:

    -Kinesiology, Hospitality Management, and Athletic Administration Complex, Engineering, Stabilization, Equipment, Planning and Construction
    Priority 1- $15,000,000
    Priority 5 - $22,000,000

    What a strange mix of facilities. Where would you put a building like this?
    In a stadium, a la, Huey P. Long . . .

  15. #465

    Default Re: Cajun Field update

    Quote Originally Posted by CajunRebel View Post
    I’m not spilling the beans, but I will share publicly available information.

    1. No structural changes are scheduled for the student side this year.

    2. If you look at the “PMAC renovations” thread, cjr3888 was nice enough to post all the items included in the spending bill for UL. This one stands out to me:

    -Kinesiology, Hospitality Management, and Athletic Administration Complex, Engineering, Stabilization, Equipment, Planning and Construction
    Priority 1- $15,000,000
    Priority 5 - $22,000,000

    What a strange mix of facilities. Where would you put a building like this?
    What you mean you can't spill the beans? This site doesn't like that. I did say all this as a joke, I don't care if you keep the beans to yourself.

Page 31 of 88 FirstFirst . 21 28 29 30 31 32 33 34 41 . LastLast

Thread Information

Users Browsing this Thread

There are currently 7 users browsing this thread. (0 members and 7 guests)

Similar Threads

  1. Construction at Lady Cajun Park
    By Turbine in forum Softball
    Replies: 2
    Last Post: October 5th, 2010, 11:47 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •