I’d imagine a CMAR model, which is similar to design/build would be implemented. CMAR is what got Southside High designed and constructed in such an incredibly fast timeline, which was basically 18 months from schematic design to substantial completion. I haven’t heard specifics on the design team or contractor, so makes me think that what some are saying regarding construction starting after next season is more accurate than after this season.