Looks like some steel work going on at the student side of CF. Overhang against the back wall. Is this the OLOL $ AT work?
Looks like some steel work going on at the student side of CF. Overhang against the back wall. Is this the OLOL $ AT work?
It’s time to set up a construction cam
I am not sure about construction, but there are between 8-10 million dollars in drainage that needs to be corrected.
I think this predates the OLOL money. Think they're just putting an overhang over the student side concessions. Hope they make it look like the south end zone to tie it in, but not sure.
I always thought there should be a cover over the concession area of the student side. It would finish off that side of the stadium and provide much needed cover for inclement weather or just to get out of the heat for a spell.
I agree. I wish we would make the NEZ seating and concessions identical to the SEZ and have the concession area on the student side mirror that. We would then have a bowled stadium with a finished look. Seems like they could do that before dealing with the all of the west side stadium enhancements.
Might be time for me to break out the old Nikon and start a before and after story.
I don't care if this is OLOL money or not, every little/big thing we can do to enhance what Cajun Field looks like is good.
Frenchie get us come good pics. THanks.
It is awning cover across the back of the student side.
that is going to look pretty good. I like it. Again, i know it is a small thing, but it is going to be something to improve the look at Cajun Field.
There are currently 1 users browsing this thread. (0 members and 1 guests)