Page 8 of 13 FirstFirst ... 5 6 7 8 9 10 11 ... LastLast
Results 85 to 96 of 145

Thread: Construction on Student Side of CF

  1. #85

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by fanof71 View Post
    Once the cox building is gone...something like the plaza at The Rock...https://appstatesports.com/news/2020...ore-plaza.aspx
    Yeah, I like it. We will need a spot for a statue of Napier once he has achieved his goals here.

  2. #86

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Boomer View Post
    ……can’t see the demo of Cox for a while…got AD and staff….RCAF…… training table…..also some other athletic related staffs!
    Boomer there will be space in the new west tower is built.

  3. Default Re: Construction on Student Side of CF

    Not a fan of any statue, anywhere.

    Give me a Keener Cagle style bio plaque everyday of the week.


  4. #88

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by fanof71 View Post
    Once the cox building is gone...something like the plaza at The Rock...https://appstatesports.com/news/2020...ore-plaza.aspx
    That is nice. But, how about a mini-version of the main campus plaza with the FDL. That helps to tie-in the athletic campus with the main campus. Then, brick the plaza with Lettermen, like we do with the Alumni Walk of Honor? Maybe we can even find a business donor willing to fund this and name the Plaza.
    Attached Images Attached Images    

  5. #89

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by MelRock View Post
    The maintenance building currently houses the A/C units for Cajun Field. The majority will not be needed. You will probably seeing some changes in the layout of tailgating once it is removed.
    This would be a good place to put a permanent bathroom facility for tailgating.

  6. #90

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Esqueleto View Post
    This would be a good place to put a permanent bathroom facility for tailgating.
    With or without showers?

  7. #91

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by fanof71 View Post
    With or without showers?
    Haha. Go ahead and throw them in.

  8. #92

    Default Re: Construction on Student Side of CF

    Gotta have some place to clean up after eating crabs.


  9. #93

    Default Re: Construction on Student Side of CF

    Should this plaza be in front of the football stadium and not hidden away in the corner?


  10. #94

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by SMD7636 View Post
    Should this plaza be in front of the football stadium and not hidden away in the corner?
    It should be between the football and baseball stadium, right where the Cox building sits.

  11. #95

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Esqueleto View Post
    It should be between the football and baseball stadium, right where the Cox building sits.
    Yep, right where it should be. Fans will be able to cheer the players on as leave the APC and enter the tunnel.

  12. Default Re: Construction on Student Side of CF

    I was planning on putting a mini swamp right there, Bullgators, Cypress trees, and all, with a tunnel connecting to campus prime.


Page 8 of 13 FirstFirst ... 5 6 7 8 9 10 11 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 6 users browsing this thread. (0 members and 6 guests)

Similar Threads

  1. Student Union Construction.
    By HelmutVII in forum Up On LA
    Replies: 759
    Last Post: November 30th, 2015, 12:48 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •