Page 12 of 13 FirstFirst ... 2 9 10 11 12 13 LastLast
Results 133 to 144 of 145

Thread: Construction on Student Side of CF

  1. Default Re: Construction on Student Side of CF

    Pressure wash the damn thing.


  2. Default Re: Construction on Student Side of CF

    Quote Originally Posted by HoustonCajun View Post
    Looking better. Still has rabbit ears. Need to remove for a more finished look.
    Spanish watchtower architecture.

  3. #135

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by RaginDave View Post
    Pressure wash the damn thing.
    No doubt! I'm free next weekend. Just need 10 more guys guys to take care of that.

  4. #136

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Turbine View Post
    Spanish watchtower architecture.
    Thats so it matches the spanish bull fight music played at halftime...

  5. #137

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by RaginDave View Post
    Pressure wash the damn thing.
    Man you ain’t lying! It’s even worse in person. Also after seeing it I wish they would have extended the awning past the lights. Although it looks much better it still looks a bit high school-ish.

  6. #138

    Default Re: Construction on Student Side of CF

    I like the rabbit ears! It Cajun Field!


  7. Default Re: Construction on Student Side of CF

    Quote Originally Posted by Esqueleto View Post
    No doubt! I'm free next weekend. Just need 10 more guys guys to take care of that.
    …..We need the female jail girls to help…..worked last time!

  8. #140

    Default Re: Construction on Student Side of CF

    Just about done with the roof and closing off the end:




  9. #141

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Frenchie35 View Post
    Just about done with the roof and closing off the end:



    Looking good! This will be a nice improvement

  10. Default Re: Construction on Student Side of CF

    Like I have said before this at worst makes to stadium look better. I think about my first game ever at CF in 1988 and what the stadium looked like. I think this stadium has a long way to go, but the additions over the past few years have been nice. We need to continue to find ways to improve the appearance until the major renovations take place. Every little bit helps.


  11. #143

    Default Re: Construction on Student Side of CF

    Quote Originally Posted by Turbine View Post
    Paint technology is so far behind, although if the order was large enough they would find a way.

    Vinyl wrap, available in any color on the planet. Updateable at any point in time.
    I had a project once where the university had the universal color code for the University red. Any paint company can mix that color if they have the correct color code.

  12. Default Re: Construction on Student Side of CF

    Quote Originally Posted by HelmutVII View Post
    I had a project once where the university had the universal color code for the University red. Any paint company can mix that color if they have the correct color code.
    Thanks.

    Since this material starts out as prepainted roll goods, I wonder what size order would be needed to get a special color?

Page 12 of 13 FirstFirst ... 2 9 10 11 12 13 LastLast

Thread Information

Users Browsing this Thread

There are currently 19 users browsing this thread. (0 members and 19 guests)

Similar Threads

  1. Student Union Construction.
    By HelmutVII in forum Up On LA
    Replies: 759
    Last Post: November 30th, 2015, 12:48 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •