I don't understand how we developed a Master Plan with stadium design, enacted the first phase with the SEZ in 2014, and are using the same firm now to re-evaluate, yet it will take 6-18 months to redesign and address any structural issues. Why weren't structural issues addressed when developing the original Master Plan? Better yet, how was a Master Plan and stadium design developed without addressing structural issues? If the same firm is being used, redesign should not take up to 1.5 years.