Improvement to CF or new football stadium will not guarantee butts in seats. Hud had a few winning seasons and the south end zone gets built, but still plenty of empty seats everywhere else.
Until the university figures out a way to get people who either choose to stay in the parking lot during games or stay home to watch the school 50 miles a way play, you could build it...and they won’t come. Oh... and you have to win... a lot.
I don’t like the analogy, but “lipstick on a pig”. Gotta keep working on the pig. Maybe the pig becomes the bull.
Makes the most sense to me too. But I would add bowling most of the NEZ in year one....both to add seats for year two, and because the current configuration is so damn ugly.
And also agree that is assuming that the cost for all this is not too close to a brand new facility.
Well there is a couple things we can do.
1. Bring the fans closer to the field.
2.’Provide luxury boxes, with premium seating between the 20’s on the upper deck
3. Provide a canopy that protects fans from the elements, and keeps in crowd noise to have an electric game day atmosphere.
4. Provide chair back seats between the 20’s on both east and west sides.
5. Provide easy access in and out of stadium ( be done because all a fan has to do is walk down to there seats with just a lower bowl with bathroom and concession stand facilities would be located throughout the entire bowl structure.
6. Winning Program
7. Better Compefition
8. Parking Tower
9. Provide Season Tickets to alumni up to 5 yrs after they graduate.
10. Get involved in the community and advertise when games are played
11. Make it hip and cool to go to the games.
12. Make it easy to get game day tickets
Plus more
If we did this I think it would entice people to come to the games to experience the atmosphere and comfort of our stadium.
If C90 is correct, we probably will be able to demo the entire Home side and replace lower level seating before the next season starts. That would be minimal effects on seating capacity and season ticket relocation and a lot cheaper than doing a NEZ and a new West side.
The entire focus is on getting that new Home side complex up ASAP, with the most bling as possible, and in the most economical way possible.
$$$$$$$$$$$$$
Just to be fair. That is an ambitious timeline and obviously in South Louisiana weather would play a big role. It would be a gamble and you are talking about having an extremely well planned out line of attack. You are literally talking about a year plus to just plan something like this and then running simultaneous crews to get it done. It has been done before though. Heck LSU did it with their additional seating capacity a few years back. The 49's built a billion+ dollar stadium in a little over two years.
Not sure of exact timing but it was completed between seasons. This job would be more substantial but as I noted you just run simultaneous crews. That is employed on many large scale projects. If the 49's can complete a 1.2 billion dollar stadium in approximately 26 months I think we can accomplish what I am talking about. Plan, Plan, Plan......it can be done.
There are currently 1 users browsing this thread. (0 members and 1 guests)