Thread: UL golf, Oakbourne partner for full-scale facility

  1. Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by Turbine View Post
    Making headway it looks like. Thanks HelmutVII
    ---About how long does it take to get from the Campus to the Country Club?

  2. #50

    Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by Boomer View Post
    ---About how long does it take to get from the Campus to the Country Club?
    About 10 to 15 minutes depending on the time of day. Longer around 5:00 p.m.

  3. #51

    Default Re: UL golf, Oakbourne partner for full-scale facility

    Looks awesome, thanks. By any chance do you have any renderings? Don't have think I ever saw any....not sure if they have been made public.


  4. #52

    Default Re: UL golf, Oakbourne partner for full-scale facility

    I have the floor plans and site plan. I did the design for utility relocation, retaining wall and foundation. I am not authorised to release any of that to anybody. There was a rendering released at the announcement of the project. It might be on the ragin cajuns web site.


  5. Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by HelmutVII View Post
    I have the floor plans and site plan. I did the design for utility relocation, retaining wall and foundation. I am not authorised to release any of that to anybody. There was a rendering released at the announcement of the project. It might be on the ragin cajuns web site.
    Cool.

    Understandable.

    Thanks.

  6. #54

    Default Re: UL golf, Oakbourne partner for full-scale facility

    Concrete for the foundations and slab was placed last night and they finished today at about noon.

    This is a view showing the building with the locker room and coaches office in the front and the teaching facility in the rear.






    This shows the view from the driving bays.


  7. Default Re: UL golf, Oakbourne partner for full-scale facility

    It looks like they are doing the construction with minimal footprint damage.


  8. #56

    Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by Turbine View Post
    It looks like they are doing the construction with minimal footprint damage.
    That's why the retaining wall was built.

  9. #57

    Default Re: UL golf, Oakbourne partner for full-scale facility



  10. Default Re: UL golf, Oakbourne partner for full-scale facility

    Surprised they are wood framing and not steel framing this building.


  11. Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by MelRock View Post

    -0--I guess I can imagine but what is a hitting bay??? how big??? are there nets like batting cages???

  12. #60

    Default Re: UL golf, Oakbourne partner for full-scale facility

    Quote Originally Posted by Boomer View Post
    -0--I guess I can imagine but what is a hitting bay??? how big??? are there nets like batting cages???
    its like hitting out of an open garage. youll hit onto the driving range, but they will have video and technology to analyze your swing.
    will still be able to hit in the rain and what not

Page 5 of 6 FirstFirst ... 2 3 4 5 6 LastLast

Thread Information

Users Browsing this Thread

There are currently 11 users browsing this thread. (0 members and 11 guests)

Similar Threads

  1. Replies: 17
    Last Post: August 20th, 2017, 09:14 pm
  2. Replies: 1
    Last Post: October 5th, 2016, 08:30 pm
  3. Replies: 0
    Last Post: August 17th, 2006, 04:53 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •