Cool deal.
Thanks for the news.
Cool deal.
Thanks for the news.
NTP was six weeks late.....
.....I kid, great news
Sewer line relocation is finished. Will transfer to new line after testing early this week. Need to degrass and haul fill in. Then build retaining wall. Very tight work space.
How much of the range is being taken up and will cliff give lessons out of the facility?
Not much if any of the existing driving range will be used. A retaining wall is being built to capture space for the buildings. There will be three indoor driving stations 2 for UL the third is for Oakbourne Members. Don't know about lessons though.
Cool deal, I know cliff usually does lessons in that corner.
Getting ready for a concrete placement at 4:00 A.M. on Saturday Morning.
This is the practice building. It will have 3 bays and some storage rooms with a place to view video
This will be the view out of the hitting bay
This will be a building for a locker room, coaches office and storage. There will also be a porch around three sides of the building for shelter from rain and sun.
Making headway it looks like. Thanks HelmutVII
There are currently 15 users browsing this thread. (0 members and 15 guests)