Page 2 of 73 FirstFirst 1 2 3 4 5 12 ... LastLast
Results 11 to 20 of 730

Thread: TIGUE UPDATE?

  1. #11

    Default Re: TIGUE UPDATE?

    I have read many posts where we are short on the money needed to construct the new Tigue....Is this really accurate? And if so does the Russo issue have anything to do with the shortage?


  2. #12

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by no1cajunfan View Post
    I have read many posts where we are short on the money needed to construct the new Tigue....Is this really accurate? And if so does the Russo issue have anything to do with the shortage?
    There are actually two threads going on about this...maybe they can be merged?

    I posted this info I received in an email from Scott F on the other thread:

    On Jun 18, 2016, at 9:42 AM, Scott Farmer wrote:

    "No financing has fallen through. All pledges for the baseball project are up to date. For various reasons, we are about a week behind. I am confident everything will be back on schedule soon."

    "It is our intention to communicate with the fan base next week."

  3. #13

    Default Re: TIGUE UPDATE?

    Update:

    The contract is signed....Still no NTP "notice to proceed".

    They will continue to do the "minor - necessities" while on location but there IS NO TIMETABLE on the NTP / Demo / Construction.

    Right now they will tear up the plants and trees, Lourdes park, and parking lot. They will complete the re-routing of electrical wiring and THAT'S IT GUYS. They have nothing else planned. There are interviews going on for sub-contractors right now, but that's just "procedural".

    IMO, this gets dragged out longer than Lamson's reno.

    THIS ISN'T GOOD


  4. #14

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by scotto_25 View Post
    Update:

    The contract is signed....Still no NTP "notice to proceed".

    They will continue to do the "minor - necessities" while on location but there IS NO TIMETABLE on the NTP / Demo / Construction.

    Right now they will tear up the plants and trees, Lourdes park, and parking lot. They will complete the re-routing of electrical wiring and THAT'S IT GUYS. They have nothing else planned. There are interviews going on for sub-contractors right now, but that's just "procedural".

    IMO, this gets dragged out longer than Lamson's reno.

    THIS ISN'T GOOD
    Is this info from Lemoine? Someone on-site, or another connection?

  5. #15

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by LaCajuns_fan View Post
    Is this info from Lemoine? Someone on-site, or another connection?
    Sounds like he talked to MAT

  6. #16

    Default Re: TIGUE UPDATE?

    Sounds like he talked to the contractor


  7. #17

    Default Re: TIGUE UPDATE?

    Why are we paying to get our concourses chopped up? We could have gotten tech and monroe fans to do that for free.


  8. #18

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by LaCajuns_fan View Post
    Is this info from Lemoine? Someone on-site, or another connection?
    Yes to all the above

  9. #19

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by Cajunologist View Post
    Sounds like he talked to MAT
    Feel free to ignore me

  10. #20
    Just1More's Avatar Just1More is offline Ragin Cajuns of Louisiana Ragin' Cajuns Greatest Fan Ever

    Default Re: TIGUE UPDATE?

    Quote Originally Posted by scotto_25 View Post
    Update:

    The contract is signed....Still no NTP "notice to proceed".

    They will continue to do the "minor - necessities" while on location but there IS NO TIMETABLE on the NTP / Demo / Construction.

    Right now they will tear up the plants and trees, Lourdes park, and parking lot. They will complete the re-routing of electrical wiring and THAT'S IT GUYS. They have nothing else planned. There are interviews going on for sub-contractors right now, but that's just "procedural".

    IMO, this gets dragged out longer than Lamson's reno.

    THIS ISN'T GOOD
    What I heard over the weekend (and although I will not reveal my source... they are directly connected)... is that engineering is actually not complete. And Lemoine... as most contractors have a habit of doing... has already announced that the cost is above the original budget. Everyone is busting it to get the cost issues resolved before diving in head first. I do not know, and neither did this individual, if there's a problem with funding with respect to the original planned project.

Page 2 of 73 FirstFirst 1 2 3 4 5 12 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Tigue update?
    By Cajunjeb in forum Up On LA (Academics)
    Replies: 148
    Last Post: July 23rd, 2015, 07:24 am
  2. Replies: 0
    Last Post: March 4th, 2014, 05:18 am

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •