Outside of third base section is black now. I'm thinking next is windows in those openings that get them. Then exterior finish. Either brick or stucco. Today is the last good day for this week as rain is coming in. I suspect that they can work on interior spaces on the first to third levels though.
Super impressed how fast its going up .. Always was told if it were to get done before 2018 lemoine was the one to do it
There are currently 76 users browsing this thread. (0 members and 76 guests)