Page 74 of 222 FirstFirst ... 64 71 72 73 74 75 76 77 84 ... LastLast
Results 877 to 888 of 2656

Thread: The Building of Russo Park at Louisiana

  1. #877

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    I was also wondering about the structure as I'm guessing this will be the bracing that will support the whole brick facing although I'm not sure how this is done on this type of structure.
    They will attach brick ties to the wall at a specified spacing with self tapping screws.

  2. #878

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    They will attach brick ties to the wall at a specified spacing with self tapping screws.
    So functionally the brick wall supports itself vertically and the strapping braces is horizontally?

  3. #879

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    So functionally the brick wall supports itself vertically and the strapping braces is horizontally?
    Yes. Technically it is a brick veneer. Not a brick wall.

  4. #880

    Default Re: Construction Cam is Up!!!!!!!!

    I just went look at LaTurds field online and wow, I thought our stadium needed an upgrade..........


  5. #881

    Default Re: Construction Cam is Up!!!!!!!!

    Getting some good work done today. It looks like some of the facade immediately in front of the close up camera eill be stucco.


  6. #882

    Default Re: Construction Cam is Up!!!!!!!!

    What is the black coating?


  7. #883

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Getting some good work done today. It looks like some of the facade immediately in front of the close up camera eill be stucco.
    How can you tell it will be stucco?

  8. #884

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    What is the black coating?
    Moisture barrier.

  9. #885

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    How can you tell it will be stucco?
    No brick ledge on the perimeter of the footing.

  10. #886

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    No brick ledge on the perimeter of the footing.
    Dare I ask? Do you have a professional-based opinion on where we will be by 03.03.17? Seems to me like they are moving at a fast clip now it getting at all closed in. Idk how much longer after that happens it will take to get it all done. Also, if the seats and their supports are pre-cast, seems like they will go up real fast as soon as they are ready for them.

  11. #887

    Default Re: Construction Cam is Up!!!!!!!!

    From what it looks like in the renderering, there will be beige stucco for ~5 ft along the entire grandstand base, the arches over the entry points and the arches along the 1st and 3rd baselines. IDK if the black portion along the fourth (top) story will also be stucco or some other material?

    Quote Originally Posted by Frenchie35 View Post
    How can you tell it will be stucco?

    Quote Originally Posted by HelmutVII View Post
    No brick ledge on the perimeter of the footing.
    Attached Images Attached Images  

  12. #888

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by LaCajunsFan View Post
    Dare I ask? Do you have a professional-based opinion on where we will be by 03.03.17? Seems to me like they are moving at a fast clip now it getting at all closed in. Idk how much longer after that happens it will take to get it all done. Also, if the seats and their supports are pre-cast, seems like they will go up real fast as soon as they are ready for them.

    I will preface this by saying all of my opinions are just that,... my opinion. It is based on what I see on the construction cam. I have no inside information nor am I connected with the project in any way.
    So from what I can see it appears that this project cannot afford any delays whatsoever with anything. I would expect the restrooms and concession facilities for the first games of the season to be Spartan at best. As the walls go up we will be seeing less and less of what is going on inside so it will be difficult to determine progress. The ultimate authority on occupancy is the Fire Marshall and Department of Health. If they aren't happy, then nobody is happy. It is what it is.

Page 74 of 222 FirstFirst ... 64 71 72 73 74 75 76 77 84 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 73 users browsing this thread. (0 members and 73 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 03:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 07:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 09:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 02:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •