The grandstand is not symmetrical. You can see on the 360 view picture that there are 3 full arches on the outside of the structure on the first base side, 3 in the middle then there are only 2 on the third base side. You can see the last section of the roof on the 3rd base side is narrower than the first base side as well. It's also visible on the final renderings put out. The furthest grandstand section outside of each entryway is different between the 3rd base side and 1st base side
Again, the 3rd base side is definitely narrower because the grandstand runs into the clubhouse. As to why they didn't make the 1st base side narrower to match, I don't really know why that is. The sun does go down on that side, so I do appreciate the extra cover.
I think, I repeat I think, it is because of the club house on the third base side. The plan is to redo the club house and move Tony's and the other coaches offices to inside the stadium. Also when I say coaches office I mean the hallway that some have to work in. Look at the pictures on the backside of the stadium and you can see it buts up to the offices.
Last edited by MelRock; January 6th, 2017 at 09:57 am. Reason: because LaTurd only wish they had our facilities
@mel, I see that, but I figured if they were butting beams through the clubhouse anyway and it is to be redone, I didn't think they would let it dictate the stadium. Does make sense though.
Not much shaking today. Can't say that I blame them.
Steel erection work going on this morning. No masonry work though. Too cold. I'm sure they are looking for stuff to do in the sun.
Re transformers. I know they were energized during demolition. Don't know if that has anything to do with green space project.
Re lamp post. They have been working on that since before Thanksgiving. Probably waiting on the lamp posts.
Both are probably part of the same project.
All a guess on my part as I am not involved with either one.