Thread: The Building of Russo Park at Louisiana

  1. #649

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    It's not a fuel issue. It's a safety issue. They need to have access to all floors in case there is an accident causing injury. Some subs will not allow their emlpoyees on a man loft due to workmans comp issues. Also, it is a logistics issue, there will be more and more trades needing to get up and down so much it would keep a lift working all day. The first level of stairs was in place before Thanksgiving.
    I'm sure you have to have permanent stairs (probably two sets) but where would you put the two elevator shafts if the stairways are staying where they are currently located?

  2. #650

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    I'm sure you have to have permanent stairs (probably two sets) but where would you put the two elevator shafts if the stairways are staying where they are currently located?
    I saw elevator shafts to the right of thr close up camera the other day.

  3. #651

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    It's not a fuel issue. It's a safety issue. They need to have access to all floors in case there is an accident causing injury. Some subs will not allow their emlpoyees on a man loft due to workmans comp issues. Also, it is a logistics issue, there will be more and more trades needing to get up and down so much it would keep a lift working all day. The first level of stairs was in place before Thanksgiving.
    Lest fuel used was tongue an cheek....should have put a smiley face....

  4. #652

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    Prior reports had more detail. If you know how to read them you can deduce that it would be possible to have access to the primary seating area as early as the second week of March.

    Now the current schedule shows Lemoine trying to finish the stadium April 22nd when the contract completion date is April 28th. That means they feel they are 6 days ahead. So you can infer based on the rumor of playing the S. Miss. series in the Tigue that the critical path for the main seating area shifts a week back as well. Which would mean the first week of March.

    Lemoine can still access the site to finish other work as needed since baseball games will happen outside of normal construction times.
    Meaning cert of occupancy would be 1st week in March?

  5. #653

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Dad04 View Post
    Meaning cert of occupancy would be 1st week in March?
    Yes but they would be asking for a "temporary certificate of occupancy" for only the sections that are substantially complete and meet all life safety and fire code requirements.

    If they do this you might actually see the critical path for the whole project slip back slightly because they will not have as much open access to the site logistically or time wise. I'm sure they will work out something with the University that makes both parties happy.

  6. #654

    Default Re: Construction Cam is Up!!!!!!!!

    1st week of March would be sweet. I've had nightmares about getting in before Easter.


  7. #655

    Default Re: Construction Cam is Up!!!!!!!!

    Took a few more photos this afternoon. Since the grandstand steel is now being installed behind the bleacher sections and thru the clubhouse I thought I'd get a few of those views as well as they don't show up very well from the current camera views. This is behind the right field bleachers.


  8. #656

    Default Re: Construction Cam is Up!!!!!!!!

    This is where todays steel work was being done.


  9. #657

    Default Re: Construction Cam is Up!!!!!!!!

    This was from the hill on the football stadium.


  10. #658

    Default Re: Construction Cam is Up!!!!!!!!

    And this shows the structural beams through the roof of the current clubhouse.


  11. #659

    Default Re: Construction Cam is Up!!!!!!!!

    Placed additional concrete for the wall at the field this morning. Placing steel decking on the third level this morning.


  12. #660

    Default Re: Construction Cam is Up!!!!!!!!

    A little bit of cinder block work (or at least staging the material) being done on the bottom level that you can see on the close view camera


Page 55 of 222 FirstFirst ... 45 52 53 54 55 56 57 58 65 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 69 users browsing this thread. (0 members and 69 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 03:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 07:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 09:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 02:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •