Thought this would be a different perspective for ya'll.
Thought this would be a different perspective for ya'll.
Is that the entire covered area for the grandstand? I thought the entire grandstand would be under cover. From the looks of the beams, only a few rows will be covered.
It's going to look like the renderings. You can only cantilever out so far but it was designed to go out as far as possible.
No amount of cover will help most people on day games since the grandstand faces south but it should be a lot more shaded seats than before
Why is it that the structure is being built up completely on the center and right sides but they don't have anything yet for the left side? I'm sure there's a construction reason for this, anyone know?
Are you asking why they're doing steel work on the 3B side but not the 1B side? If that's what you are getting at, I assume it's a pretty logical progression on the project. They couldn't pour the whole slab for the entire structure at once so they did one side first then the next. Once the first slab was set, they got the steel work going while other guys did the concrete on the 1B side. So, one side will lag slightly time-wise. It really doesn't matter what goes up when, I'd imagine. There will always be something for them to work on.
Also, like CajunAmos said, they did leave a large gap in the slab to get the crane out on the 1B side. That won't stop them from putting steel up though I think