    Quote Originally Posted by CajunAmos View Post
    When I passed today it looks like they've gone as far as they can with steel until the next concrete pour. They were working in the last section behind home plate and the section down the right field line.
    They can erect floor joists and other bracing. According to Eric Crozier the steel erection should never catch up to concrete placement.

  2. #458

    Default Re: Construction Cam is Up!!!!!!!!

    Might be ready for that pour Friday and remove forms Monday to start placing steel.......


  3. #459

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    They can erect floor joists and other bracing. According to Eric Crozier the steel erection should never catch up to concrete placement.
    I wonder if we would be able to get simple floor plan renderings.....so we can see where everything will be located. Fat chance, I'm sure.

  4. #460

    Default Re: Construction Cam is Up!!!!!!!!

    Moving the crane this morning. They will be erecting the stadium section soon on this portion of the structure.


  5. #461

    Default Re: Construction Cam is Up!!!!!!!!

    Moving some fairly large sections into staging area to erect later. Looks like support girders for stadium seating.

    Can't really see too much of the slab but i estimate concrete tuesday or wednesday of next week.


  6. #462

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Moving some fairly large sections into staging area to erect later. Looks like support girders for stadium seating.

    Can't really see too much of the slab but i estimate concrete tuesday or wednesday of next week.
    They had a lot of bodies working in the area of the next pour yesterday. I will say there appears to be a very large number of PVC pipes coming out of the foundation. I'm assuming some are electrical as well as the normal water and DWV services?

  7. #463

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    They had a lot of bodies working in the area of the next pour yesterday. I will say there appears to be a very large number of PVC pipes coming out of the foundation. I'm assuming some are electrical as well as the normal water and DWV services?
    I'm also thinking suites, club, and broadcast areas will have air conditioning. Do you think this will be individual room type for each area?

  8. #464

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Moving some fairly large sections into staging area to erect later. Looks like support girders for stadium seating.

    Can't really see too much of the slab but i estimate concrete tuesday or wednesday of next week.
    Also looks like they are installing some tension cabling between members. I know I've seen this in warehouse structures but is this typical for this type of structure?

  9. #465

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Also looks like they are installing some tension cabling between members. I know I've seen this in warehouse structures but is this typical for this type of structure?
    Temporary cables. They will install permanent sway bracing to get the structure square and stable after they get more steel in place. They will go back and tighten things up later. The steel will expand and contract depending on its exposure to the sun. They need to get enough of the structure up to square it up and get enough load on the structure.

    I have built several water towers. When we would fill it up the first time it would creek and groan due to the weight of the water. Kind of scary the first time you experience something like that. You would swear the damn thing was coming down on your head. The erection crew would sometime have to come back to tighten things up because the columns would compress about 1/2 to 3/4 inch. Ladders are NEVER attached to the floors because they get crushed.

  10. #466

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Temporary cables. They will install permanent sway bracing to get the structure square and stable after they get more steel in place. They will go back and tighten things up later. The steel will expand and contract depending on its exposure to the sun. They need to get enough of the structure up to square it up and get enough load on the structure.

    I have built several water towers. When we would fill it up the first time it would creek and groan due to the weight of the water. Kind of scary the first time you experience something like that. You would swear the damn thing was coming down on your head. The erection crew would sometime have to come back to tighten things up because the columns would compress about 1/2 to 3/4 inch. Ladders are NEVER attached to the floors because they get crushed.
    Thanks for the info.

    It looks like now they may be working on extending the currently installed steel structure for the lower levels of the grandstand rather than working on the unpoured section toward right field.

  11. #467

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Thanks for the info.

    It looks like now they may be working on extending the currently installed steel structure for the lower levels of the grandstand rather than working on the unpoured section toward right field.
    That is correct. The steel erection will never catch up to the concrete work.

  12. #468

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    They had a lot of bodies working in the area of the next pour yesterday. I will say there appears to be a very large number of PVC pipes coming out of the foundation. I'm assuming some are electrical as well as the normal water and DWV services?

    White pipe is DWV, grey pipe is electric and communication, and copper is domestic water.

Page 39 of 222 FirstFirst ... 29 36 37 38 39 40 41 42 49 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 94 users browsing this thread. (0 members and 94 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 03:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 07:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 09:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 02:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •