Thanks Frenchie. That pretty much lines up with the time frames I've heard and the progression in the project milestones. The buildout calls for them to kind of work from the third baseline over to the first baseline. I'm going to make an assumption that two things are driving that. One logistically they need the first base side to remain open to make it easier to maneuver. Two the sooner they finish the third base side the sooner the guys can potentially get back into the clubhouse.