fewer lifts on the site today. The only thing I see to do on the exterior envelope is to place some cast stone under the left window over the third base entrance. I'm sure there re a few other minor things to do but I can't tell from the camera views. Next is clean up and touch up and they should be through.
The open sections on the second level were all supposed to be covered but the covering was supposed to allow air flow.
Placing hand rails at the steps in the close up camera. Looks like they are picking up rental equipment too. This is indeed the end of the end. Time to clean up
There are currently 17 users browsing this thread. (0 members and 17 guests)