I could live with that, but would prefer to see the screens.
But, there are 2 x 4's along the bottom of each of the openings, and I wonder if anyone....especially helmut....could decipher what they are for? I mean, all that is there are the tops of the concessions, bathrooms, etc., so I guess they had to have them for the workers and wil not be necessary once construction is done?
I wish they would move the bottom camera.
The brick wall is completed here.
Starting to remove scaffolding at the third base entrance this morning. Getting close to wrapping things up.
Doesn't the poured walkway in the view look very narrow? I'm assuming they'll have to have a much wider walkway. Also that looks like a good step up between the two poured slabs. I would have guess they have leveled this out as I thought they had a handicap ramp shown on the third base entry and this appears to be build to have a step.
There are currently 31 users browsing this thread. (0 members and 31 guests)