  1. #2089

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunEXPRESS View Post
    The illustration suggests screening with baseball themes IMO
    There are other illustrations that show nothing and I believe that will be what happens.

  2. #2090

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    There are other illustrations that show nothing and I believe that will be what happens.
    I could live with that, but would prefer to see the screens.

    But, there are 2 x 4's along the bottom of each of the openings, and I wonder if anyone....especially helmut....could decipher what they are for? I mean, all that is there are the tops of the concessions, bathrooms, etc., so I guess they had to have them for the workers and wil not be necessary once construction is done?

  3. #2091

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by LaCajunsFan View Post
    I could live with that, but would prefer to see the screens.

    But, there are 2 x 4's along the bottom of each of the openings, and I wonder if anyone....especially helmut....could decipher what they are for? I mean, all that is there are the tops of the concessions, bathrooms, etc., so I guess they had to have them for the workers and wil not be necessary once construction is done?
    The 2x4s appear to be a temporary hand rail. It's required by OSHA.

  4. Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    What goes in all those openings on the second floor in front of ticket office?
    Fresh air

  5. #2093

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Turbine View Post
    Fresh air
    Put 10-12" Louvers there. Close those openings. It will look like crap if they don't.

  6. #2094

    Default Re: Construction Cam is Up!!!!!!!!

    I wish they would move the bottom camera.
    The brick wall is completed here.


  7. #2095

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by IberiaCajun View Post
    I wish they would move the bottom camera.
    The brick wall is completed here.
    Been look at that brick wall for maybe 4-5 months now. It ain't moved yet. The wall that is.

  8. #2096

    Default Re: Construction Cam is Up!!!!!!!!

    Starting to remove scaffolding at the third base entrance this morning. Getting close to wrapping things up.


  9. #2097

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HelmutVII View Post
    Starting to remove scaffolding at the third base entrance this morning. Getting close to wrapping things up.
    Doesn't the poured walkway in the view look very narrow? I'm assuming they'll have to have a much wider walkway. Also that looks like a good step up between the two poured slabs. I would have guess they have leveled this out as I thought they had a handicap ramp shown on the third base entry and this appears to be build to have a step.

  10. #2098

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Doesn't the poured walkway in the view look very narrow? I'm assuming they'll have to have a much wider walkway. Also that looks like a good step up between the two poured slabs. I would have guess they have leveled this out as I thought they had a handicap ramp shown on the third base entry and this appears to be build to have a step.
    I doubt that it is a walkway, I would think it is there to help with erosion around the base of the stadium.

  11. #2099

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunAmos View Post
    Doesn't the poured walkway in the view look very narrow? I'm assuming they'll have to have a much wider walkway. Also that looks like a good step up between the two poured slabs. I would have guess they have leveled this out as I thought they had a handicap ramp shown on the third base entry and this appears to be build to have a step.
    They aren't nearly complete with the pour. That narrow section allows them to be precise with the work adjoining the building and get their slopes started correctly.

  12. #2100

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    They aren't nearly complete with the pour. That narrow section allows them to be precise with the work adjoining the building and get their slopes started correctly.
    Thanks. Based on that I'm assuming the levels will even out with the slope away from the stadium?

Page 175 of 222 FirstFirst ... 165 172 173 174 175 176 177 178 185 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 27 users browsing this thread. (0 members and 27 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 03:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 07:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 09:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 02:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •