If they are working, it must be in the club house. Don't see any employees. Don't see the crane boom either.
If they are working, it must be in the club house. Don't see any employees. Don't see the crane boom either.
Strong winds preventing any steel work. Electricians and plumbers working today.
Yes potable water. Copper is not used for fire sprinkler systems. Don't think there would be a sprinkler system at the stadium.
Thanks
Looks like they are jumping all over this building. Is that stairs they are installing on the third base side? I know what they are trying to do. Eliminate using those lifts to put employees on higher floors. Take the stairs, lest fuel used.......
Looks like they've been installing stairs on the 3rd base side over the last day or so along with the continuing plumbing/electrical. Also, have about 2/3 of the backstop wall done
It's not a fuel issue. It's a safety issue. They need to have access to all floors in case there is an accident causing injury. Some subs will not allow their emlpoyees on a man loft due to workmans comp issues. Also, it is a logistics issue, there will be more and more trades needing to get up and down so much it would keep a lift working all day. The first level of stairs was in place before Thanksgiving.
There are currently 64 users browsing this thread. (0 members and 64 guests)