It's offloading steel this morning
Steel being unloaded today at #TheTigue pic.twitter.com/rNoedRE0zm
— UL Ragin' Cajuns (@ULRaginCajuns) October 24, 2016
It's offloading steel this morning
Steel being unloaded today at #TheTigue pic.twitter.com/rNoedRE0zm
— UL Ragin' Cajuns (@ULRaginCajuns) October 24, 2016
Getting close to a hard point on the time line. Looks like they may be starting to erect steel before all of the slab is completed to compress the time line.
Agreed but I think that is different. It was my understanding that the main concessions area would be at the top of the grandstands and would be designed so that when you are up there you still had a clear view to the field. With all that said I haven't seen anything since the conception drawings so not sure on final product.
Think I have narrowed down one thing though. The stadium area will be a hybrid system. The runners (what you walk on) will be pre-cast concrete. The risers (vertical between the runners) will be aluminum. This will give you the feel of concrete but with reduced weight because of the aluminum risers. Appears to be a nice system.
https://www.youtube.com/watch?v=xM9Mszjuk3c
Eric Crosier. (Architect) will be on Schultz show on 103.7 tomorrow.
There are currently 1 users browsing this thread. (0 members and 1 guests)