They are wrecking forms this morning.
It's no problem. They just need to be careful around it for a few days. Most curbing and paving is done by "slip form" method. That is with no forms. It is high early strength and close to zero slump. Concrete pipe is made with zero slump concrete. It's all good, believe me.
They are backfilling between the footings now. They have moved the forms to the right of the camera and will be doing footings in that area. We will not be able to see what they are doing because of the way the camera is set up. The next thing to do directly in front of the camera is the Slab on Grade. This will happen after the finish with the footings to the right of the camera screen. When the finish with the slab on grade I will be able to get an idea of they schedule.