  1. Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by HoustonCajun View Post
    To really tie it into campus would be when the Cox building is demolished, build a quad with a smaller version of the FDL fountain.
    ...Like ur idea...I think that more brick will be added to the IPF and the A P c in the
    Future to get more theme elements.....T Bine please get your site working, this little type thing I use is driving me crazy!!!

  2. #2252

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by CajunEXPRESS View Post
    Five feet is what I would want. Room for a scooter and pedestrian traffic.
    After passing by again this morning it looks like the walk is at least 4 feet wide.

    I also noticed they were pulling up the track at the track and soccer stadium.

  3. #2253

    Default Re: Construction Cam is Up!!!!!!!!

    didnt they just redo the track surface like 4-5 years ago? how long is a life cycle on that kind of material?


  4. #2254

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    One shot that looks like the Stadium is completed:


    i spy a water hose, hopefully it is used for more than watering grass

  5. #2255

    Default

    Quote Originally Posted by GeauxCajuns View Post
    didnt they just redo the track surface like 4-5 years ago? how long is a life cycle on that kind of material?
    That surface usually last about 7-10 years in S. Louisiana. High schools and recreational parks usually push it closer to 10 years

  6. #2256

    Default Re: Construction Cam is Up!!!!!!!!

    Looking at the close up camera shot of the second floor opening I see what same to be some sort of intake or exhaust system that has been in place for some time now. Anyone know what this might be. The 6x6 railing is still in place for safety reasons. Also any word if all those opening will remain like is are will there be some type of louvers for air flow in place. Going there today and if one of the workers is around I will ask the question and hopefully he will have the answer. Will also try to get permission to go in the stadium and get pictures of the suites and press box which I don't think anyone has seen yet. That might be a chore though......


  7. #2257

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Frenchie35 View Post
    Looking at the close up camera shot of the second floor opening I see what same to be some sort of intake or exhaust system that has been in place for some time now. Anyone know what this might be. The 6x6 railing is still in place for safety reasons. Also any word if all those opening will remain like is are will there be some type of louvers for air flow in place. Going there today and if one of the workers is around I will ask the question and hopefully he will have the answer. Will also try to get permission to go in the stadium and get pictures of the suites and press box which I don't think anyone has seen yet. That might be a chore though......
    Frenchie the exhaust is for some of the kitchen equipment. No louvers.

  8. #2258

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by Cajun90 View Post
    Frenchie the exhaust is for some of the kitchen equipment. No louvers.
    I think it would look better with louvers or some type of slatted opening over each of the openings, not just over the exhaust ducts. They could be painted to match the rest of the dark gray metal, but I don't think it's terrible open. Obviously the wood railings will need to come down eventually

  9. #2259

    Default Re: Construction Cam is Up!!!!!!!!

    Quote Originally Posted by wcd35 View Post
    Obviously the wood railings will need to come down eventually
    Wouldn't be surprised to see that up for a little while longer. It wouldn't be uncommon for some of the concession equipment and installation of that equipment to be outside the scope of Lemoine. Which means others may need access up there for a little while until that work is finished.

  10. #2260

    Default Re: Construction Cam is Up!!!!!!!!

    Lemoine had an item for FFE (Furniture, Fixtures and Equipment) in their contract. Don't know if that was for all of it though. I suspect that any covering of those openings won't happen until all of the finish work is done. That can happen any time.


Page 226 of 266 FirstFirst ... 216 223 224 225 226 227 228 229 236 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. Replies: 0
    Last Post: February 28th, 2019, 02:50 pm
  2. Replies: 1
    Last Post: May 16th, 2018, 06:46 pm
  3. Louisiana Hosts No. 16 LSU at Russo Park
    By NewsCopy in forum Baseball
    Replies: 0
    Last Post: March 6th, 2018, 06:15 pm
  4. Replies: 0
    Last Post: March 4th, 2017, 08:05 pm
  5. Replies: 0
    Last Post: December 13th, 2016, 01:15 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •