Looks like they are making a push to finish the third base entrance today. Hope they make it before the rain. They plugged up the scaffold support holes on the third base side. With that they should be finished with the bruck work.
Looks like they might make it today.
Yep....all of the pre-cast stones seemed to be done. From what I can tell, here are the only things left of the exterior work:
1. The metal siding panel just to the left of the 3rd base entry.
2. Metal siding panel on the window directly above the 3rd base entry, along with a few small side panels along side the windows in that section.
3. Metal siding along the top of the 3rd base bleachers, along with the roof of those bleachers.
4. Both the screens all along the facade and the large FDL's, if they are to be included like in the rendering.
What goes in all those openings on the second floor in front of ticket office?
The illustration suggests screening with baseball themes IMO
I could live with that, but would prefer to see the screens.
But, there are 2 x 4's along the bottom of each of the openings, and I wonder if anyone....especially helmut....could decipher what they are for? I mean, all that is there are the tops of the concessions, bathrooms, etc., so I guess they had to have them for the workers and wil not be necessary once construction is done?