I think it would look better with louvers or some type of slatted opening over each of the openings, not just over the exhaust ducts. They could be painted to match the rest of the dark gray metal, but I don't think it's terrible open. Obviously the wood railings will need to come down eventually
Wouldn't be surprised to see that up for a little while longer. It wouldn't be uncommon for some of the concession equipment and installation of that equipment to be outside the scope of Lemoine. Which means others may need access up there for a little while until that work is finished.
Lemoine had an item for FFE (Furniture, Fixtures and Equipment) in their contract. Don't know if that was for all of it though. I suspect that any covering of those openings won't happen until all of the finish work is done. That can happen any time.
Lord have mercy. After laying all that new turf behind the ticket office, they are now digging it up. Maybe to form and pour more walkways.....That cat with the water hose and a scrub brush is in need of a pressure washer and cleaning solution.....I got two, a 3600 & 3000 psi I can rent....
Now that they have cleared out much of the construction clutter you can see how well the lighting works around the stadium.
Looks as awful as that shed across the street. JMO. The openings are way too big.
I also feel like they missed big time on the design of the grandstand. Would have been better to have a split level with a walkway separating 2 levels.
As it is now, the 1st 6-10 rows have people CONSTANTLY walking right in your view of the action. Worst seats in the house if you ask me. JMO
Looks like they are installing security cameras. They just put something that looks like a camera by the second level mid stadium. Might be more coming.
There are currently 5 users browsing this thread. (0 members and 5 guests)