fewer lifts on the site today. The only thing I see to do on the exterior envelope is to place some cast stone under the left window over the third base entrance. I'm sure there re a few other minor things to do but I can't tell from the camera views. Next is clean up and touch up and they should be through.
The open sections on the second level were all supposed to be covered but the covering was supposed to allow air flow.
There are currently 10 users browsing this thread. (0 members and 10 guests)