Page 4 of 13 FirstFirst 1 2 3 4 5 6 7 ... LastLast
Results 37 to 48 of 149

Thread: Tigue update?

  1. #37

    Default Re: Tigue update?

    Quote Originally Posted by Zeebart21 View Post
    Anyone know how far back UL property goes past the left field fence? What kind of room do we have back there?

    Z
    not great, but I went on the tax assessor's site, then did a screen shot. Looks more than 15 ft, but not sure.
    Attached Images Attached Images  

  2. #38

    Default Re: Tigue update?

    Quote Originally Posted by cajuns_fan View Post
    not great, but I went on the tax assessor's site, then did a screen shot. Looks more than 15 ft, but not sure.

    From the left field corner to the property line is about 60 feet. The closest point is about 40 feet. I'm thinking the people that live there might have something to say about that. Best thing to do is double deck the entire existing grand stand and bleacher section. It could be done in phases. Demolish the original grand stand rebuild with new press box and double deck then do one bleacher section at a time. There is room its just a matter of what gets moved (cajun cooking club, Lourdes park etc) and where.

  3. #39

    Default Re: Tigue update?

    Quote Originally Posted by HelmutVII View Post
    From the left field corner to the property line is about 60 feet. The closest point is about 40 feet. I'm thinking the people that live there might have something to say about that. Best thing to do is double deck the entire existing grand stand and bleacher section. It could be done in phases. Demolish the original grand stand rebuild with new press box and double deck then do one bleacher section at a time. There is room its just a matter of what gets moved (cajun cooking club, Lourdes park etc) and where.
    You have any idea how much room we would need to do some type of treehouse bleechers back there?
    And I agree with the earlier post: with all the room we orginally had on that huge parcel of land, we sure seemed to have squeezed too much into one area, land locking our selfs pretty badly.

  4. #40

    Default Re: Tigue update?

    The Tigue should be built north of Congress, new from the ground up. Where it is now should become the site of an indoor track facility.

    All it takes is lots of money.


  5. #41

    Default Re: Tigue update?

    Quote Originally Posted by VObserver View Post
    The Tigue should be built north of Congress, new from the ground up. Where it is now should become the site of an indoor track facility.

    All it takes is lots of money.

    We have 5M in the bank. For a completely new facility you're looking at almost 35M.

  6. #42

    Default Re: Tigue update?

    Quote Originally Posted by VObserver View Post
    The Tigue should be built north of Congress, new from the ground up. Where it is now should become the site of an indoor track facility.

    All it takes is lots of money.
    This I Like!!!! ALOT!!!!

  7. #43

    Default Re: Tigue update?

    Quote Originally Posted by barchief View Post
    This I Like!!!! ALOT!!!!
    Enough to pony up the 40 or 50 million it would take to do it right? Lol

  8. #44

    Default Re: Tigue update?

    Quote Originally Posted by cajuns_fan View Post
    You have any idea how much room we would need to do some type of treehouse bleechers back there?
    And I agree with the earlier post: with all the room we orginally had on that huge parcel of land, we sure seemed to have squeezed too much into one area, land locking our selfs pretty badly.
    Plus you have to deal with zoning setbacks from the adjacent property line.

  9. #45

    Default Re: Tigue update?

    Quote Originally Posted by cajuns_fan View Post
    Are you able to give a description of what the prelimary drawings you saw looked like?
    The section drawing showed suite levels, concessions, toilets, and suites/press box. The new grandstand will be what looks like 3 times the size of the existing one. This will make sight lines and focal points different and will be a little bit farther from the field.

    Store would be on the right side entrance into the grandstands. Trees by ticket office will stay. Upper concourses on first and third base bleachers with possible concessions. 10 suites. Designated handicapped seating spaces in grandstand area also.

    Remember that these were only preliminary drawings i saw.

  10. #46

    Default

    Quote Originally Posted by VObserver View Post
    The Tigue should be built north of Congress, new from the ground up. Where it is now should become the site of an indoor track facility.

    All it takes is lots of money.
    Obviously, tough to do but sounds very awesome when ya think about it!

  11. #47

    UL Baseball Re: Tigue update?

    I wish they would build a new Tigue in the parking lot so that when you are at home plate you would look to the outfield and see the elevator shaft that has Cajun Field. You could then bring temporary seating in the outfield when needed. You then take the lot where the Tigue is now and use it for RV parking for Cajun Field.

    Attached Images Attached Images  

  12. #48

    Default Re: Tigue update?

    Learned this in the past year, but most (not all) baseball stadiums face the same direction. The Tigue is totally backwards from this "standard". Look at satellite shots of other college parks too.

    http://www.infoplease.com/askeds/bas...ented-sun.html
    http://www.ballparks.com/baseball/ge...acts/diamonds/


Page 4 of 13 FirstFirst 1 2 3 4 5 6 7 ... LastLast

Thread Information

Users Browsing this Thread

There are currently 2 users browsing this thread. (0 members and 2 guests)

Similar Threads

  1. TIGUE UPDATE?
    By JMV JustMyView in forum Up On LA
    Replies: 729
    Last Post: July 4th, 2016, 07:10 pm

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •